Get $1,000 off a full roof replacement. Book by December 31, 2026.See offer terms Get started
Finished grey shingle roof with three skylights flashed into the field and mountains behind, Chilliwack

Skylights · Chilliwack and the Fraser Valley

Skylight Repair and Installation in Chilliwack, BC

Framed to code, sealed with ice and water shield over the whole area, and flashed with VELUX's own kit. Every layer laps the one below it, so water has one way to go: off the roof.

  • Framing checked to the BC Building Code
  • Ice and water shield over the whole area
  • VELUX flashing kits, never caulk
  • 10 year labour warranty on our work

Leaking skylight? It is usually the flashing

When a skylight drips, the glass is almost never the problem. The water is getting in where the skylight meets the roof: the metal flashing around it, the membrane under the flashing, or a bead of caulk that someone trusted to hold water out and that has now dried and cracked. Sealant is never the thing keeping a house dry. Laps and gravity do that, which is why a skylight we flash gets the VELUX kit, with the sill flashing over the course below, step flashing woven into every course up the sides, and the head flashing under the courses above. Every layer laps the one below it, so water has one way to go, off the roof.

That is also why reflashing an existing skylight often fixes a leak without touching the unit itself. We check the framing and the ice and water shield around the opening while we are in there, and we tell you plainly if the skylight is at the end of its life. The inspection is free either way.

2
rafter spacingsAny opening wider than this gets doubled framing on each side. That is the BC Building Code.
14° to 85°
roof slopeThe range the VELUX shingle kit is made for. 14 degrees is about a 3 in 12.
0
caulk holding water outLaps and gravity do that. Sealant is never the thing keeping your house dry.
10 yr
labour warrantyOn our installation. The skylight carries the manufacturer's own warranty.

How a skylight stays dry

Three things keep the water out. Most leaking skylights are missing one.

Structure

The rafters cut for the opening hand their load to headers. If the framing is not to code, or the blocking has gone soft, it is reblocked before anything else goes on.

Membrane

Ice and water shield over the whole area around the opening, and VELUX's adhesive underlayment wrapped up the frame and lapped onto it. The layer that catches anything the metal misses.

Metal

The VELUX kit: a pleated sill, step flashing woven in with every course, and a saddle across the top. Each piece sheds onto the one below. No caulk.

The installation

Layer by layer, in the order it goes on

The drawing looks down on the roof, ridge at the top and eave at the bottom. Choose a step, or on a larger screen just scroll, and it builds up the way the roof does.

UP TO THE RIDGEDOWN TO THE EAVESaddle flashing, shingles lap over it

Step 7 of 7Saddle flashing and shingles over the top

On our own roofs

This is what step two looks like on a real job

The full write up
Skylight opening with dark ice and water shield laid across the whole surrounding deck and wrapped up the frame
Ice and water shield across the whole area around the opening, wrapped up the frame, before any metal.
Close view of a skylight frame wrapped in membrane, lapped onto the shield on the deck, ready for flashing
Wrapped and lapped, ready for the sill, the step flashings and the saddle.
Finished grey shingle roof with skylights at sunset, Chilliwack
Finished: a Chilliwack re roof from September 2026, skylights flashed into the new field.
Old flashing, cracked sealantDry

5 / 5 Saddle flashing, shingles woven back

The flashing

The VELUX flashing kit, piece by piece

A VELUX deck mounted skylight is flashed with a kit made for that exact frame and that roofing. On shingles it has four parts, and they go on in this order.

  1. 1Adhesive skylight underlaymentWraps the bottom, both sides and the top of the frame before any metal. This is what makes the system watertight without caulk.
  2. 2Sill flashingThe pleated apron at the downhill side, formed onto the shingles below. The frame's own gasket sits over it.
  3. 3Step flashingsOne per shingle course up both sides, woven in so each piece sheds onto the one below.
  4. 4Saddle flashingAcross the top, under the shingles above. It carries everything coming down the roof around both sides.

We use the kit rather than bending our own. It fits that frame without improvising, and VELUX backs its skylights with its own No Leak installation warranty only when they go in with VELUX flashing, installed the way VELUX says. That warranty is VELUX's, and its terms are on velux.ca. Our part is installing it so it qualifies.

Every step, in order, is in our skylight installation guide.

Under the shingles

Framing to code, before anything else

A skylight opening is a gap cut through the structure of your roof, and the rafters that were cut have to hand their load to something. Part 9 of the BC Building Code is specific: on any roof opening wider than two rafter spacings, the framing is doubled on each side, with headers top and bottom carrying the cut rafters.

On older Fraser Valley houses we regularly open a skylight and find a single header, blocking that was never fastened properly, or wood that has been wet for years. If it is not to code, it gets reblocked first: 2x6 headers and blocking, doubled where the code calls for it, full rafter depth on bigger rafters. If a new unit needs more opening than the code's simple rules cover, that is an engineer's call, and we say so.

Our standard, above the minimum

Ice and water shield over the whole area

The flashing sheds water, and on a correctly flashed skylight nothing should ever get past it. But this valley gets rain sideways off the mountains for days at a time, snow sits on roofs above Hope, and a skylight below a valley is taking the run off from half the roof.

So the membrane is not a narrow strip around the hole. Self adhering ice and water shield goes down across the whole area around the skylight, every sheet lapped so the higher one sits on top, sealing itself around every nail. VELUX's underlayment wraps the frame and laps onto it.

Choosing the right unit

Deck mounted or curb mounted

Most pitched shingle roofs

Deck mounted

  • Sits straight on the roof deck on its brackets
  • Flashed in with the shingles by the VELUX kit
  • The lower, cleaner look from the street
  • Best on a new roof or a re roof, when everything goes on together

Low slopes and flat roofs

Curb mounted

  • Sits on a raised wooden box built on the deck
  • For slopes too low for the deck mounted kit
  • The answer on flat and low slope roofs
  • Sometimes right when a sound curb is already in place

We tell you which your roof needs, and why. More on low slope work on our flat roofing page.

Leaking skylights

What we actually find when we open one up

Almost every leaking skylight we are called to has been caulked at least once. It comes back every winter, because the problem was never something sealant could fix.

No step flashing up the sides

One long piece or a bead of sealant instead of a step flashing per course. Water gets behind it at the first course.

A head flashing lapped the wrong way

Water coming down the roof runs under the metal instead of over it, and soaks the framing above the opening.

Little or no membrane

Fine until the first wind driven storm or ice backing up under the shingles, and then nothing is behind the metal.

Framing that was never right

A single header, loose blocking, or wood wet long enough to go soft. That is why we look before we quote.

A failed unit

Fogging between the panes is the glass seal, not the flashing. No roof work fixes it, and we will say so.

Condensation, not a leak

A cold skylight over a wet bathroom with no fan runs with water down the inside of the frame. Not a roofing problem.

The best time

Do your skylights with the roof

During a re roof the membrane, the flashing and the shingles all go on together, and nothing gets cut into a finished roof later. If your skylights are over fifteen years old and a new roof is coming, do them at the same time. It costs a fraction of doing them separately, and the flashing and shingles end up the same age, under one warranty.

How a roof replacement works
The whole finished house from the Chilliwack skylight re roof, mountains behind

Project · Chilliwack · September 2026

Shingle re roof with two skylights

One day, usually

A single skylight is normally one day on site, weather permitting. Reframing an opening that is not to code can add to that, and we tell you before we start.

Half up front

The unit and the kit are most of the cost and are bought before we start. The balance is due when you have walked the job with us and you are happy.

10 year labour warranty

On our work. The skylight carries the manufacturer's own warranty, which is theirs, and we will show you what it actually covers.

Questions

Skylight questions we get asked

A stain near a skylight makes the skylight a suspect, not a conviction. Water runs along a rafter before it drips, so we find where it is actually getting in first. A leak right now? Start with roof repair.

How long does a skylight installation take?

A single skylight is normally one day on site, weather permitting. If the opening is not framed to the BC Building Code and has to be reblocked first, it can take longer, and we tell you before we start.

Can a leaking skylight be fixed with caulking?

Not for long. Sealant is asked to hold water out by sticking to two surfaces that move at different rates, and on a Fraser Valley roof it goes brittle in a few years and lets go. A correctly flashed skylight keeps water out with lapped metal and membrane, and gravity.

Should I replace my skylights when I replace my roof?

If they are over fifteen years old, yes. During a re roof the membrane, the flashing and the shingles all go on together, nothing is cut into a finished roof later, and it costs a fraction of doing the skylights separately.

What is the difference between a deck mounted and a curb mounted skylight?

A deck mounted skylight sits straight on the roof deck and is flashed in with the shingles. It is the usual choice on a pitched shingle roof. A curb mounted skylight sits on a raised wooden box, and is the answer on slopes too low for the deck mounted kit, on flat and low slope roofs, and sometimes where a sound curb is already in place.

Do you use the manufacturer's flashing kit?

Yes. We install VELUX skylights with VELUX's own flashing kits. They are made for that frame and that roofing, and VELUX's No Leak installation warranty only applies when its skylights go in with VELUX flashing installed to its instructions. That warranty is VELUX's, and its terms are on velux.ca.

What warranty comes with a skylight installation?

Our work carries our 10 year labour warranty. The skylight itself carries the manufacturer's own warranty, which is theirs, and we will show you what it actually covers.

More skylight questions

Is it a leak or condensation?

Condensation shows as beading on the glass on a cold morning and dries by noon. A leak shows as a stain on the drywall around the well or a drip that follows rain. Most leaking skylights are missing one of the three things that keep water out, and it is usually the flashing, not the glass.

Should I replace my skylights when I get a new roof?

If they are over fifteen years old and a new roof is coming, do them at the same time. The flashing kit goes in with the shingles, and the roof is only open once.

How long does a skylight job take?

A single skylight is normally one day on site, weather permitting.

Do skylights need to be resealed?

A properly flashed skylight does not need sealant to stay dry, and a skylight that only stays dry because of sealant will leak again when the sealant ages, usually in three to five years here. If yours has been resealed before, the fix is the flashing, not another tube of caulk.

Where we do this work

Hope to Abbotsford, along Highway 1 and Highway 7.

How it works

Six steps, start to finish. No surprises, no pressure.

  1. Call or text us

    Evenings and Saturdays too. We get back to you within 24 hours.

  2. We come out and get on the roof

    The inspection is free. We take photos and show you what we find.

  3. You get your quote by email

    One clear price, what is included and what is not. Nothing gets added after the fact.

  4. Pick your shingle colour and book your date

    Reply "approved" and pay the deposit. On small repairs that is half up front. On a full roof it covers your materials.

  5. We do the job

    Most repairs take a day. A full roof is usually about three days, weather permitting. We clean up every day.

  6. Walk it with us, then pay the balance

    Every job carries our 10 year labour warranty, and the shingles carry the manufacturer’s own warranty.

If your home was built before 1990, we check the build year before quoting any work that disturbs existing material, and we tell you up front if asbestos testing is needed.

Free, no obligation

Get a free roof assessment

Tell us what you are seeing and we will come and look. We will give you a straight answer about what the roof needs, and what it does not. What a free roof inspection covers.

4.611 Google reviews

“They do everything right, no shortcuts.” Kevin, Rosedale

Get $1,000 off a full roof replacement. Book by December 31, 2026.See offer terms

We use cookies and the Meta Pixel. Meta receives information about your visit and uses it to measure our ads and show you ads. Decline turns it off. Privacy policy