How to Measure and Order Metal Roof Panels and Trim
Panel count from coverage width, cut length per plane, the trim list and the waste allowance, so the order arrives right the first time.
- Intermediate
- 2 to 4 hours
- Updated
The short answer
To order metal roofing, measure each roof plane's eave-to-ridge length and width, divide the width by the panel's coverage width (not its overall width) and round up to get the panel count, then add the eave overhang and ridge allowance to the length. List trims separately by linear foot: eave, rake, ridge, hip, valley and wall flashings. Panels are cut to length, so order waste mainly in trim.
Metal panels are roll-formed or brake-formed to a length you specify, which is the opposite of shingles. There is no walking back to the truck for another bundle. A panel that is cut 2 inches short at the factory cannot be stretched, and a wrong colour or width sits in the yard for weeks while the replacement is made. Ordering is where most cost and delay in a metal roof project lives.
The mathematics are simple: panel count comes from the width of the roof and the coverage width of the panel, and panel length comes from the run of the roof plus the overhang. The hard part is the trim list, which is ten or more different parts, each ordered in standard lengths, and each a place a mistake causes a leak. This guide builds an order from a roof plan or roof report in a repeatable sequence.
Before ordering, be sure of the profile (panel types), the deck and strapping (strapping for metal) and the underlayment (metal roof underlayment).
Tools
- Tape measure, 100 foot
- Roof pitch gauge
- Graph paper or a roof diagram
- Calculator
- Roof report or aerial measurement if available
Materials
- Panel manufacturer order form or takeoff sheet
- Manufacturer trim catalogue
- Notes on colours and finishes
- Photos of eaves, valleys and penetrations
Safety first
- Take measurements from the ground, the attic or a roof report wherever possible. Walking a roof just to tape it is an avoidable fall risk.
- If you must go on the roof, work tied off to an anchor. WorkSafeBC requires fall protection where a fall could be 3 metres (about 10 feet) or more, and lower falls onto hard surfaces can also cause serious injury.
- Long panels are awkward loads. Plan delivery and staging so panels are not carried across slopes or over wet ground by one person.
Step by Step
Step 1: Break the roof into planes and label them
Give every plane a letter: A for the main south slope, B for the main north slope, C for the garage and so on. For each, record the eave length, the slope length from eave to ridge (the rafter length), and the pitch. A roof report from an aerial measurement service gives plan dimensions and pitch, and you then calculate the real slope length.
Real slope length equals plan run times a pitch multiplier. For example, a 4/12 roof multiplies by about 1.054, 6/12 by 1.118, 8/12 by 1.202 and 12/12 by 1.414. Rafter length is the number panels are cut to, not the flat distance from the eaves to the ridge on a drawing.
Tip: Photograph each plane and mark its label on the photo. When a panel arrives cut to 'Plane C, 18 foot 4 inch', a photo saves a lot of second-guessing.
Step 2: Get the coverage width and length limits from the profile data sheet
Coverage width is how much roof one panel covers after the lap or seam, and it is always less than the overall width. A 16 inch snap-lock panel covers about 16 inches, but an R-panel with a 36 inch coverage is about 38 inches overall. Use coverage width for every count.
Also note the maximum length the forming machine and delivery truck can handle. Panels of 30 to 40 feet are common, and longer runs mean transport and handling problems and much bigger thermal movement. If the rafter length exceeds what you can handle, plan a mid-roof splice with the lap required by the manufacturer, or a transverse joint designed for the panel. See thermal movement in metal roofs.
Step 3: Calculate panel count per plane
Take the eave length and divide by coverage width. For a 30 foot (360 inch) eave and a 16 inch coverage, that is 22.5 panels, so 23. Round up, but decide before ordering how the last panel will sit. A narrow sliver panel (under roughly 6 inches of coverage) is hard to seam or lock and looks wrong, so it is often better to trim the first and last panels so both are a similar partial width.
Work rake to rake, not wall to wall. On a gable roof with a rake trim, the panels stop short of the wall by the amount the rake trim requires. On a hip roof, each plane is a trapezoid, so panel lengths change from one side to the other, and every panel needs its own cut length. Hips and valleys mean a cut list, not a single number.
Step 4: Calculate each panel length
Start with the slope length. Add the eave overhang past the fascia, typically 1 to 2 inches, so the drip edge or eave trim throws water clear. Subtract the ridge gap required by the ridge detail, often 1 to 2 inches for a vented ridge, or add a hem allowance if the panel is folded at the ridge as an end dam. See how to hem and bend panel ends.
For a hip roof or a roof with a valley, panels are cut on an angle at the hip or valley, so order the longest length in that run and plan to trim on site, or order angled cuts from the supplier if they offer them. Write the list so every panel that is identical is grouped, for example '23 pieces at 18 feet 4 inches'. That shortens the order form and lets the roll former run them in one batch.
Watch out: Order panels one to two inches longer than calculated only if the manufacturer's eave detail calls for a hem or drip. Extra length you did not plan for has to be cut off, and cutting pre-finished panels risks finish damage.
Step 5: Build the trim list, one piece at a time
Go around the roof and write each edge and junction on the diagram: eave trim, rake or gable trim, ridge cap, hip cap, valley flashing, sidewall and endwall flashing, transition trim where a low roof meets a wall, and trim at each dormer or skylight. Convert each to a length and divide by the standard trim length, usually 10 feet, to get a count. Add about 4 to 6 inches of lap at every joint, or follow the manufacturer's lap dimension.
Closures are separate from trim. Foam or rubber closures that seal the panel profile at the eave, ridge and sidewalls are ordered to match the panel. See the guides for eave trim and closures, rake trim, ridge and hip caps and valleys for what each needs.
Step 6: List fasteners, clips, sealants and accessories
Screws are ordered by the box, often sized from the roof area and the screw pattern. The count depends on the profile: a clip system needs clips at the spacing the panel specifies, and an exposed-fastener roof needs screws at each purlin or strap line across each panel. See metal roof screws for types and lengths.
Add butyl or sealant tape for laps and penetrations, matching touch-up paint for cut edges and scratches, pipe flashings sized to the actual pipes (flashing pipes on metal), snow guards if the roof needs them (snow guards), and any vents or caps. Underlayment and strapping belong to the same order.
Step 7: Add a sensible allowance and recheck the numbers
Panels themselves usually need very little allowance on a simple roof, because each is cut to length. On a complex roof with many hips and valleys, angled cuts waste material, and adding one or two spare panels for a mistake or transit damage is cheap insurance. For trim, an allowance of about 10 percent covers laps and cutting mistakes.
Recheck every measurement from a second source, such as the roof report against a tape. A quick test is to add up the panel coverage widths along each eave and confirm they match the eave length within an inch or two. Also verify colour, gauge and finish on the order form against the quote.
Step 8: Confirm lead time, delivery and staging
Lead times change with season and colour. Stocked colours may ship in days, custom colours and long cut lengths may take weeks, and the busy season before fall in BC is the slowest. Confirm the date in writing and order the roof before tearing the old one off, never after.
Panels arrive banded in bundles on wood dunnage. Plan where they will rest: flat, off the ground, slightly sloped so any water drains, and covered without trapping moisture. Wet bundles stored flat and closed can develop white rust between panels, known as wet stack staining, which can mar the finish.
Working From a Roof Report
An aerial roof report lists plane areas, pitches, eave, rake, ridge, hip and valley lengths. Those totals are useful for trim, but panel counts still need plane-by-plane widths and lengths, because a total area in squares does not tell you how many 16 inch panels fit. Use the report for the trim takeoff and verify plane dimensions with a tape where you can reach them.
Colour and Lot Matching
Paint lots can vary slightly. Order panels, trim and closures together from one supplier and one run so the colour matches on the roof. Reordering later for a forgotten trim piece may come from a different paint lot and show a slight shade difference at the ridge or rake.
Common Mistakes
- Using overall width instead of coverage width. The panel count comes up short and the last bay has no panel.
- Calculating from plan dimensions and forgetting the pitch multiplier, so every panel is ordered too short.
- Forgetting the eave overhang and ridge allowance, leaving panels that stop short of the drip or cover the ridge closure.
- Ordering trim by the total roof perimeter and missing the laps, which leaves the last trim piece a few inches short.
- Ordering panels and trim in separate orders from different paint lots, which shows as a colour change along the ridge.
- Storing panels flat and wet, causing white rust staining before they are installed.
- Ordering custom lengths before verifying the deck and fascia are square, then finding the eave line is not straight.
When to Call a Professional
A simple gable roof with one plane each side can be taken off by a careful owner. A roof with hips, valleys, dormers, skylights and several pitches needs a proper cut list, and a single wrong dimension repeats across many panels.
If the order is large, the colour is custom or the roof has more than a few penetrations, have a roofer or the supplier's estimator check the takeoff before the order is placed. The cost of a review is far smaller than the cost of a re-roll.
Fraser Roofing does free roof inspections across the Fraser Valley, from Hope to Abbotsford. See our Metal Roofing service or the towns we cover.
How to Measure and Order Metal Roof Panels: Questions
How do I calculate how many metal roofing panels I need?
Divide the eave length of each roof plane by the panel's coverage width, not its overall width, and round up. A 30 foot eave with a 16 inch coverage panel needs 23 panels. Repeat for every plane, then set each panel's length from the eave-to-ridge slope length plus the overhang. Trim and fasteners are counted separately.
What is coverage width on a metal roof panel?
Coverage width is the width of roof a single panel actually covers once it is lapped or seamed to the next one. It is smaller than the panel's overall width because of the overlap. An R-panel may be about 38 inches wide overall but cover 36 inches. Always use coverage width to figure how many panels the roof needs.
How much extra metal roofing should I order?
Panels are cut to length, so panel waste is small on simple roofs, and a spare panel or two covers mistakes on complex ones. Trim and fasteners typically need about 10 percent extra for laps and cutting errors. Extra beyond that is usually unused. Hips and valleys produce angled offcuts that cannot be reused.
How long does it take to get metal roofing panels?
Lead times range from a few days for stocked colours and standard lengths to several weeks for custom colours, long lengths or busy season. Suppliers in BC are typically busiest before fall. Ask for a written delivery date, and do not start the tear-off until the panels and trim are confirmed and ready.
Can I order metal roofing from a roof measurement report?
A roof report gives plane areas, pitches and edge lengths, which is enough for a trim list and a rough estimate. For panels you still need each plane's eave length and slope length to calculate panel count and cut lengths. Use the report as a starting point and confirm the plane dimensions before sending a final order.
Related Guides
All Metal Roofing guides|The full How-To Library
This guide is general education. Always follow the product manufacturer's installation instructions, the BC Building Code and WorkSafeBC requirements, which take priority over anything written here.
Want someone to look at your roof?
Kory & Johnny have roofed homes across the Fraser Valley since 2016. Free inspections, honest estimates, no pressure.
604-728-0146Text UsEmailServing Hope, Agassiz, Chilliwack, Rosedale, Abbotsford & the entire Fraser Valley
