Underlayment for Metal Roofs: What Goes Under the Panels
High-temperature underlayment, ice and water shield at the edges, slip sheets and the condensation control that keeps the deck dry.
- Advanced
- 4 to 8 hours for an average house
- Updated
The short answer
Metal roofs need underlayment rated for high temperature because dark panels in summer sun run far hotter than the air, commonly 70 degrees Celsius or more, and heat the layer directly beneath them. Install self-adhered ice and water shield at eaves, valleys and penetrations, then cover the rest with a high-temperature synthetic or self-adhered membrane, lapped shingle-style, before panels go on. A vented air gap or slip sheet reduces condensation and abrasion.
Underlayment is the second roof. Metal panels shed the vast majority of water, but wind-driven rain can be pushed under laps, condensation forms on the cold underside of the panels, and ice dams can push meltwater up under panels at the eave. The underlayment is what catches all of that, which is why the wrong product here is the most common hidden failure on a metal roof.
The real differences from a shingle roof are heat and movement. Dark metal panels in direct sun can reach temperatures that soften standard asphalt felt or cheap synthetic underlayment, which then sticks to the back of the panel or oozes through the fasteners. Panels also slide slightly as they heat and cool, so an underlayment with a rough surface can abrade or be pushed around. High-temperature products and slip sheets exist because of this.
Underlayment sits on the deck or on the strapping. See how to strap a roof for metal for an over-deck batten system, and choosing the panel to see which profiles need a solid deck.
Tools
- Utility knife with hook blade
- Cap nailer or hammer tacker as the product allows
- Roller for self-adhered membrane
- Chalk line
- Tape measure
- Fall protection equipment
Materials
- High-temperature underlayment, synthetic or self-adhered, rated for metal roofs
- Self-adhered ice and water shield
- Cap nails or cap staples as listed by the underlayment manufacturer
- Slip sheet or rosin paper where the panel manufacturer specifies it
- Primer for self-adhered products on dusty or cold decks
Safety first
- Synthetic underlayment is slick, especially when damp or dusty. Tie off and wear soft soled boots with good tread.
- Do not leave underlayment exposed to UV longer than its rating. Wind can lift unsecured rolls and take you with them on a steep roof.
- Fall protection is required at 3 metres (about 10 feet) and wherever a fall could cause serious injury under WorkSafeBC rules.
Step by Step
Step 1: Inspect and prepare the deck
Any bump in the deck telegraphs through metal, especially through thin panels, and any nail head that is proud will wear a hole in the underlayment as the panel moves. Hammer down or remove loose nails, plane down uneven sheet joints and replace damaged plywood.
Sweep the deck clean and dry. Self-adhered membranes will not stick to dusty, damp or frosty sheathing. In cold weather, prime the deck if the membrane manufacturer requires it, and follow its minimum application temperature, which is commonly around 5 degrees Celsius for ice and water shield.
Step 2: Install self-adhered ice and water shield at the eaves
Start at the eave with the membrane edge flush to the drip edge or overhanging it slightly, press it down firmly and continue up the roof. The BC Building Code's eave protection rule is written for shingle, shake and tile roofs (at least 900 mm up the slope and 300 mm inside the inner face of the wall), and it is a sensible minimum under metal too. On a typical 12 to 16 inch overhang that means two courses of 36 inch membrane. In snow country such as Hope and up the canyon it is common to go higher. Follow the panel manufacturer and your local building department. For full detail, see how to install ice and water shield.
Choose a high-temperature membrane for metal. Standard ice and water shield is rated for shingle roofs and may soften under dark metal in summer. Products rated for metal list a service temperature of around 120 degrees Celsius. Check the product data sheet.
Tip: Lay self-adhered membrane in the warm part of the day, peel the release film back a foot at a time and press from the centre outward to avoid wrinkles.
Step 3: Protect valleys, penetrations and roof to wall edges
Valleys get a 36 inch wide strip centred on the valley, with each side lapping up the slopes. Around pipes and skylights, cut the membrane to the opening and press it tight into the corner so it seals around the penetration. At a sidewall, run the membrane up the wall by 4 to 6 inches and out onto the deck.
These are the places where metal roofs leak first, typically because a trim or flashing allows water past the panel. The membrane gives a second chance. See metal roof valleys and metal roof wall flashing for the trim details that go over it.
Step 4: Roll out the main underlayment from eave to ridge, lapping shingle-style
Snap a chalk line so the first course is square to the eave. Lap horizontally in a shingle fashion so water flows over every seam and never into it. End laps are commonly 6 to 12 inches and are staggered between courses. Overlap the ice and water shield at the eave, with the main layer lapping over the top of the self-adhered course.
Use only the fasteners the product calls for, normally plastic cap nails or cap staples, at the spacing on the roll. Do not use thin staples that pull through. Cover the roof promptly after uncovering it, or keep it within the UV exposure limit on the label, which may be as short as a few weeks for some synthetics.
Watch out: Never use standard 15 or 30 pound asphalt felt under a metal roof unless the panel manufacturer expressly approves it. Felt can dry out, bond to the panel and fail long before the panels do.
Step 5: Lap membrane over the ridge correctly
Run the upper courses up past the ridge by a few inches and lap them over each other, or lay a single continuous piece centred on the ridge. On a vented metal ridge, hold the underlayment back from the ridge opening so air can move, or cut it to the width of the vent slot as the ridge detail requires. See ridge and hip caps.
At hips, cut the courses square and lap them with a cover strip of self-adhered membrane over the hip line for extra protection.
Step 6: Add a slip sheet or separation layer if the panel calls for it
Certain panels, especially clipped standing seam and snap-lock panels, slide against the underlayment as they heat and cool. A slip sheet, typically rosin paper or a proprietary slip layer, sits between the membrane and the panels to allow this movement and to reduce sticking. A self-adhered membrane directly under the panel can grip it and cause noise or oil canning, so the slip sheet matters more in a hot climate.
Some high-temperature synthetics are built with a slick surface and need no separate slip sheet. The panel manufacturer's installation manual will state which is required. See thermal movement in metal roofs for why.
Step 7: Plan condensation control and ventilation
Metal has no vapour permeability and its underside is cold at night, so warm humid air from the house can condense under the panels and wet the deck. The defences are an airtight ceiling below, a ventilated attic, and in some assemblies a ventilated airspace created by battens or strapping under the panels, with open intake at the eave and an exhaust at the ridge.
Metal roofs installed over an existing shingle roof with strapping should have continuous airflow through the strapped cavity. Closure strips that seal the eave and ridge against birds and bugs must still allow vent paths where the design depends on them. Match the closures to the design, not the other way around.
Synthetic, Self-Adhered or Felt: How to Choose
Three families of underlayment are used under metal. Do not choose by price alone, because the underlayment has to outlive the panels' finish and survive being hot for decades.
- High-temperature synthetic: a woven or laminated polymer sheet, rated to a stated service temperature, mechanically fastened. It is the common choice for the field of the roof.
- Self-adhered high-temperature membrane: fully adhered to the deck, so it seals around fasteners. Used at eaves, valleys and sometimes across the whole roof where leak risk is high.
- Standard asphalt felt: cheap, but it can soften and dry out under metal. Used only where the panel manufacturer lists it as acceptable.
Fraser Valley Notes
Long wet seasons push rain sideways and into laps, so a self-adhered layer at the eaves, valleys and wall junctions is worth doing on every job. Coastal mild winters with frequent freeze and thaw cycles create condensation and, in snow country such as Hope, ice dams at the eave. Plan a continuous underlayment layer, good attic ventilation and an airtight ceiling before worrying about panel details.
Common Mistakes
- Using standard felt or shingle-rated underlayment under dark metal, where heat softens it and it sticks to the panel.
- Skipping the self-adhered layer at eaves and valleys, where wind-driven rain and ice dams push water up under the panel.
- Leaving the underlayment exposed beyond its UV rating while waiting for panels to arrive.
- Using the wrong fasteners, such as plain staples that pull through the underlayment in wind before the panels are on.
- Sealing the eave and ridge with closures and leaving no ventilation path on a vented design, trapping moisture.
- Installing without a slip sheet where required, which can cause abrasion, sticking and noise.
When to Call a Professional
If the deck is damaged, the roof is steep, or you are working over an existing shingle roof with strapping, this is a job for a roofer. Underlayment mistakes are invisible once the panels are on, and they show up as leaks and rotten sheathing years later.
Ask a roofer to check the ventilation and ceiling airtightness in the same visit, because condensation problems are an assembly issue and the underlayment cannot fix them alone.
Fraser Roofing does free roof inspections across the Fraser Valley, from Hope to Abbotsford. See our Metal Roofing service or the towns we cover.
Underlayment for Metal Roofs: Questions
What underlayment goes under a metal roof?
Use a high-temperature underlayment, either a synthetic sheet rated for metal roofs or a self-adhered high-temperature membrane. Put self-adhered ice and water shield at the eaves, valleys and penetrations. Standard asphalt felt can soften under dark panels in the sun, so use it only where the panel manufacturer approves it.
Do you need ice and water shield under a metal roof?
It is strongly recommended at eaves, valleys, penetrations and wall junctions. The BC Building Code's eave protection rule is written for shingle, shake and tile roofs, but panel manufacturers commonly call for a self-adhered layer at the eaves, especially in snow country. Metal roofs shed snow and ice quickly, and meltwater and wind-driven rain can be pushed up under panels. A self-adhered layer seals around fasteners and gives a waterproof backup if a panel or flashing leaks.
What is a slip sheet on a metal roof?
A slip sheet is a thin layer, often rosin paper or a proprietary slip material, placed between the underlayment and the metal panels. It lets panels expand and contract without sticking to or abrading the underlayment, and it reduces noise. Some panel manufacturers require one, particularly for clipped standing seam, so check the installation manual.
Why does my metal roof have condensation underneath?
Metal is cold at night and does not absorb moisture, so warm humid indoor air that reaches the underside condenses into water droplets. The causes are usually an unsealed ceiling, poor attic ventilation and no airspace or vapour control under the panels. Fix the air leaks and ventilation first, then use an underlayment and airflow design meant for metal.
How long can underlayment be left exposed before the metal goes on?
It depends on the product. Synthetic underlayments are commonly rated for UV exposure from a few weeks to several months, and self-adhered membranes are often rated for much less. Read the data sheet for the product and plan to cover the roof within that window. Do not leave it exposed over winter waiting for delivery.
Related Guides
All Metal Roofing guides|The full How-To Library
This guide is general education. Always follow the product manufacturer's installation instructions, the BC Building Code and WorkSafeBC requirements, which take priority over anything written here.
Want someone to look at your roof?
Kory & Johnny have roofed homes across the Fraser Valley since 2016. Free inspections, honest estimates, no pressure.
604-728-0146Text UsEmailServing Hope, Agassiz, Chilliwack, Rosedale, Abbotsford & the entire Fraser Valley
