How to Install Metal Rake (Gable) Trim on a Metal Roof
The gable edge takes the worst wind on the roof. Trim that is lapped, fastened and closed correctly keeps the panels attached and the water out.
- Advanced
- 2 to 5 hours
- Updated
The short answer
Rake trim caps the gable edge of a metal roof. Fit it with the underlayment under the trim (the opposite of the eave), lap sections 2 to 4 inches in the direction water flows with sealant between, and fasten on the roof leg at the manual's spacing, commonly 12 to 24 inches. Close the ends with a cap at the eave and ridge and seal the panel edge with closures or tape.
Wind hits the rake edge harder than anywhere else on the roof. Air pushes up under the panel edge, and if trim and panel fastening are weak, the first damage is usually a peeled corner. The rake trim serves two jobs: it keeps wind and rain from getting under the panel edge and it finishes the roof with a clean line along the gable.
The detail changes by panel type. On a clipped standing seam roof, a rake trim often engages the first panel's seam. On an exposed-fastener roof, the trim sits over the last rib with closures underneath. The underlayment order is also different from the eave, which is where most errors are made: at the rake, water runs down the roof and across the trim, so the trim goes over the underlayment.
Read the rake together with the eave trim and the ridge cap, since the three meet at the corners.
Tools
- Sheet metal brake or ready-formed trim
- Aviation snips
- Hand seamer
- Impact driver
- Chalk line and string line
- Tape measure and square
- Fall protection equipment
Materials
- Rake trim or gable trim matched to the panel
- End caps or folded ends
- Trim screws with washers
- Butyl sealant tape
- Rake closures or J-channel as the profile requires
- Self-adhered membrane for the edge
- Touch-up paint
Safety first
- The rake edge is an open drop on a gable roof. Install a guard rail or work tied off, and never lean over the edge to fasten trim.
- Long trim sections are bendy, catch wind and cut. Carry them on edge and fasten promptly.
- WorkSafeBC requires fall protection at 3 metres (about 10 feet) and wherever a fall of any height could cause serious injury.
Step by Step
Step 1: Check the gable edge and snap a reference line
Rake boards are often wavy. Run a string along the edge and find high and low spots. Shim or pack the trim, or set the reference line on the roof instead of the board, so the panel line is true. The gap between the panel and the trim should be uniform along the whole rake.
Replace any rotted rake board or barge board first. Metal trim over rot hides the damage and gives no holding power for screws.
Step 2: Run self-adhered membrane and underlayment correctly at the rake
At the rake, water flows across and down the roof toward the eave, so the underlayment goes under the trim at the gable edge. That is the opposite of the eave, where the underlayment laps over the drip edge. Run membrane or underlayment right to the rake edge, then fasten the trim through it.
Many details add a strip of self-adhered membrane over the trim's roof leg, or along the edge, to seal fasteners. Follow the panel manual. See metal roof underlayment.
Step 3: Fit the first section of trim from the eave up
Set the trim with its vertical leg covering the face of the rake board and the roof leg flat on the deck. Start at the eave so that each upslope piece laps over the piece below it, as with shingles. Lap 2 to 4 inches, or the amount in the manual, with a bead of butyl tape between sections.
Keep the trim straight and its bottom edge at the same distance from the fascia at both ends. Check with a string. A trim that drifts towards the roof at one end looks crooked from the ground.
Step 4: Fasten the trim at the right spacing and place
Use trim screws with washers, placed on the flat part of the roof leg that the panel will cover, never on the vertical face. Fastener spacing is commonly 12 to 24 inches on centre, and the first few feet from the eave and ridge get closer spacing because wind loads are highest at the corners. Follow the engineering in the panel's manual.
Also fasten the drip leg along the face at the listed spacing if the trim requires it, and use ring-shank nails or screws long enough to reach solid wood. See metal roof screws.
Watch out: A rake is where screws pull out first in storm wind. Do not skimp on spacing or fasten into underlayment alone.
Step 5: Close the panel edge with closures, tape or channel
Exposed-fastener panels are closed with foam closures cut to the rib profile, sitting under the last panel edge and against the trim. Standing seam and snap-lock panels engage a receiver or J-channel, or sit on a bed of tape, depending on the profile. The last panel is usually cut to width, so its edge stays straight and the cut edge is hidden by the trim.
Do not block the panel's ability to expand and contract. Closures and channels must hold the edge without pinching it. See thermal movement in metal roofs.
Step 6: Finish the ends at the eave and ridge
At the eave, the rake trim often ends over the eave trim with a cut and fold or an end cap. At the ridge, it runs up under the ridge cap or is capped with a matching piece. Bend the ends using a hand seamer and seal any open corners with sealant and a rivet or screw. See hemming and bending panel ends.
Check the corner closely, since it is where eave trim, rake trim and panel all meet and where most gable leaks start.
Gable Overhangs and Wind
An overhanging rake acts as a wing, and wind pushing up under it can peel the trim and panel edge. Keep the overhang short, support wide overhangs with outlookers, and follow the manufacturer's closer fastener spacing at rakes. In the Fraser Valley, outflow winds through the canyon and winter storms from the south mean rake edges on exposed sites deserve the tightest spacing in the manual.
Rake Trim Versus Barge Board
The rake trim can cover a wood barge board, or it can be mounted on a structure without one. Covering wood is common, and it protects it from weather, but the board must be dry and solid. If you box the rake with trim and leave no path for moisture to escape, trapped damp will rot the wood behind it. Leave a drip gap at the bottom of the vertical leg.
Common Mistakes
- Laying the trim under the underlayment at the rake, which lets water run behind it. At the rake the trim goes on top.
- Wrong lap direction, which sends water into the joint instead of over it.
- Skimping on fastener spacing at the corners, where wind uplift is greatest.
- No closures or tape under the panel edge, allowing wind-driven rain to enter.
- Fixing trim to a rotten rake board, which gives no holding power.
- Leaving the ends at the eave and ridge open.
When to Call a Professional
Gable edges are the highest-risk spot for falls and for wind damage. If the roof is steep, the rake is high, or the barge board is rotten or overhangs far, use a roofer.
If an existing rake trim is lifting in wind, a roofer can check fastening into solid wood and whether the panel edge itself is secured.
Fraser Roofing does free roof inspections across the Fraser Valley, from Hope to Abbotsford. See our Metal Roofing service or the towns we cover.
How to Install Metal Rake (Gable) Trim: Questions
What is rake trim on a metal roof?
Rake trim, also called gable trim or rake flashing, is the metal piece that covers the sloped edge of the roof at a gable end. It protects the panel edge and the rake board from wind and rain and gives the roof a finished line. It is fastened to the deck and sealed or closed against the panel edge.
Does rake trim go over or under the underlayment?
At the rake, the trim goes over the underlayment, so water running across the roof cannot get under the trim. At the eave, the underlayment goes over the trim instead. The rule is that the upper layer laps over the lower in the direction water flows. Check the manual for the exact panel detail.
How far apart should metal roof rake trim screws be?
Commonly 12 to 24 inches on centre, with closer spacing near the eave and ridge corners where wind uplift is highest. The exact spacing depends on the panel, the wind exposure and the engineered load. Use screws with washers long enough to reach solid wood, and follow the panel manufacturer's manual.
How much do you lap metal rake trim?
Sections are typically lapped 2 to 4 inches, with the upslope piece over the downslope piece so water passes over each joint. A bead of butyl tape or sealant between the laps seals them. The manufacturer's manual gives the exact lap dimension for its trim.
Related Guides
All Metal Roofing guides|The full How-To Library
This guide is general education. Always follow the product manufacturer's installation instructions, the BC Building Code and WorkSafeBC requirements, which take priority over anything written here.
Want someone to look at your roof?
Kory & Johnny have roofed homes across the Fraser Valley since 2016. Free inspections, honest estimates, no pressure.
604-728-0146Text UsEmailServing Hope, Agassiz, Chilliwack, Rosedale, Abbotsford & the entire Fraser Valley
