Get $1,000 off a full roof replacementSee offer terms. Get started
Roofing Resources
Blog

How to Hem, Fold and Bend Metal Roof Panel Ends: Drip Hems, End Dams and Notches

Hand seamer technique for the eave drip, the ridge end dam and the notched ribs where panels meet valleys and walls.

  • Advanced
  • 5 to 10 minutes per panel end
  • Updated

The short answer

Hem a metal panel end by marking a fold line about 1/2 to 1 inch from the edge, clamping the panel in a hand seamer or brake, and bending steadily to a flat hem. At the eave the hem forms a drip. At the ridge, notch the ribs and turn the top up about 1 inch into an end dam. Bend slowly, from the centre out, to avoid cracking paint.

Metal roof panels are not just cut and fastened. Their ends are shaped. At the eave, a fold under the lower edge creates a drip that throws water clear of the fascia and stiffens the edge. At the ridge, the top of the panel is turned up into an end dam so wind-driven rain and snow cannot run back under the cap. Where a panel meets a valley, a wall or a penetration, the cut edge is hemmed or the rib is notched so it folds neatly.

The tools are simple, a pair of hand seamers and a mallet, but the technique is not. Bend too fast and the paint cracks. Crush the rib and the panel will not seat. Hem too wide and the edge will not clear the closure. Practising on offcuts before touching a roof panel is the best habit you can build.

Hemming follows cutting and comes before final fitting at the eave, ridge and valley. For tool technique, see how to use hand seamers.

Tools

  • Hand seamers, 3 inch and 6 inch
  • Sheet metal brake for wide hems
  • Aviation snips, left and right
  • Offset snips for notches
  • Rubber or rawhide mallet
  • Fine-tip marker and square
  • Cut-resistant gloves and eye protection

Materials

  • Panel offcuts to practise on
  • Touch-up paint matched to the finish
  • Butyl sealant tape for the folded edges
  • Closures matched to the profile

Safety first

  • Bent and cut edges are sharp enough to cut through gloves. Wear cut-resistant gloves and keep fingers clear of the seamer jaws.
  • Hemming at the eave or ridge puts you at the edge of the roof. Stay tied off and never lean out to fold an end in place.
  • WorkSafeBC requires fall protection at 3 metres (about 10 feet) and wherever a fall of any height could cause serious injury.

Step by Step

  1. Step 1: Decide which fold the detail calls for

    A drip hem at the eave is a small fold, about 1/2 to 1 inch, turned back under the panel. An end dam at the ridge is an upward bend of about 1 inch, sometimes with a second return. A cut edge at a valley is hemmed about 1/2 to 1 inch. The manual gives the size and direction.

    Always fold on the side that hides the raw edge and leaves the finished face up.

  2. Step 2: Mark the fold line and set up the support

    Use a square and measure the same distance from the end along the whole width. On a ribbed panel, mark each rib and each flat. A fold that wanders shows at the eave as a wavy line.

    Clamp the panel flat or support it on both sides of the fold line. Working on a bench or sawhorses is much easier than on the roof. Padded supports protect the finish.

  3. Step 3: Notch the ribs so the flat can fold

    On ribbed and standing seam panels, the ribs stand in the way of a fold across the panel end. Cut a vertical notch at each side of a rib or seam leg, and cut the rib top back by the width of the fold. The flat between can then fold neatly. On standing seam, notch the seam leg to the marked line and avoid cutting into the flat.

    Make notch cuts square and stop exactly at the fold line. Overcutting leaves a hole that water can pass. Use offset snips for a tight fit in corners. A nibbler makes neat notches, and abrasive cutters should not be used. See cutting metal roof panels.

    Watch out: Do not cut past the fold line. A notch that is too deep opens a gap at the end dam where water and snow can enter.

  4. Step 4: Start the bend with a seamer and work across the flat

    Put the jaws on the fold line with the edge of the panel inside them. A hand seamer is wide enough to make a short bend of 3 or 6 inches, so work from the centre of the flat toward each end, overlapping each bite by half. Keep the pressure steady so the bend is even.

    A quick single pass with too much force stretches the paint and can crack it along the fold. Start the bend slowly and in stages, and keep the tool square to the edge.

    Tip: Warm panels bend easier. On a cold morning, a few minutes in the sun reduces paint cracking at the fold.

  5. Step 5: Close the fold to a hem or set the end dam angle

    For a hem, bend to about 90 degrees, then close to 180 degrees with the seamer, leaving a small rounded nose rather than a sharp crease. For an end dam, bend up to about 90 degrees and check the height against the gauge in the manual. Use a wood block and a rubber mallet to flatten, never a steel hammer directly on the panel.

    Check that the fold is straight along the whole width. A gap at one end means the bend angle is inconsistent. Pull it tighter with the seamer.

  6. Step 6: Seal the notches and dress the ends

    Where ribs are notched, press a small piece of butyl tape into the corner, or dab sealant, so wind-driven rain does not find the gap. Keep the sealant small and neat, since it shows on the finished roof.

    File off burrs and touch up any exposed steel and any cracked paint with matched paint. Test-fit the end against the closure or trim before fastening.

  7. Step 7: Dry fit before fastening

    A hem that is too wide will not slide into the trim, and an end dam that is too tall will foul the ridge cap. Adjust now, since after fastening it is difficult. Keep the first finished panel as a template for the rest in the run.

Why Paint Cracks When You Bend

Pre-painted steel has a thin paint film that stretches on the outside of a bend. Tight radii, cold metal, fast bending and a hard paint system all raise the risk of crazing or cracking. Bending around a small radius, such as a sharp crease, stresses the paint most. A gentle radius, slow passes and warm metal keep the film intact. The manufacturer's manual often lists a minimum bend radius for the finish.

Using a Brake for Wide Panels

A hand seamer is fine for narrow snap-lock and standing seam panels and short sections of trim. For wide or long hems, a sheet metal brake gives a straight, repeatable fold. See how to use a sheet metal brake. Bend a test piece first to set the bar height and pressure.

Common Mistakes

  • Bending too fast, which cracks the paint along the fold.
  • Cutting notches past the fold line, leaving a hole.
  • Uneven hems that wander across the panel width.
  • Using a steel hammer directly on the panel, which dents and scars the finish.
  • Hemming before dry-fitting, then finding the panel does not fit the closure.
  • Folding on the wrong side, leaving the raw edge exposed.
  • Skipping touch-up paint on cracked fold lines.

When to Call a Professional

Simple hems on short trim pieces are a good DIY skill once you have practised. Notching and folding long panels at a standing seam eave and ridge, where every panel repeats the detail, is skilled work and a mistake repeats along the whole roof.

If you are going to do it, buy a few spare panels or use offcuts to perfect the fold before touching the roof panels.

Fraser Roofing does free roof inspections across the Fraser Valley, from Hope to Abbotsford. See our Metal Roofing service or the towns we cover.

How to Hem, Fold and Bend Metal Panel Ends: Questions

What is a drip hem on a metal roof panel?

A drip hem is a small fold, about 1/2 to 1 inch, turned under the lower edge of a panel at the eave. It stiffens the edge, hides the raw cut and creates a drip line so water falls clear of the fascia instead of curling back under the panel. Standing seam and snap-lock panels commonly use one.

What is an end dam on a metal roof?

An end dam is an upturned fold, about 1 inch high, at the top end of a panel where it meets the ridge. It stops wind-driven rain and snow from running back under the ridge cap or the closure. The ribs are notched so the flat can be folded up. The manufacturer's manual gives the dimension.

How do you bend metal roofing without cracking the paint?

Bend slowly in small passes, use a gentle radius, and work when the metal is warm. Support the panel on both sides of the fold and use a hand seamer or brake, not a hammer. Practise on offcuts of the same finish first. Cold steel and quick, sharp bends are the main causes of cracked paint.

What tool do you use to fold metal roof panel ends?

A hand seamer is the main tool for short folds on panel ends and trim. A sheet metal brake is better for long or wide hems. Aviation and offset snips notch the ribs, and a rubber mallet with a wood block flattens the fold. Use cut-resistant gloves, because bent edges are sharp.

Related Guides

How to Cut Metal Roof Panels Without Damaging the FinishCut pre-painted metal roof panels with electric shears, a nibbler, or aviation snips, which cut cold and leave a clean edge. Avoid abrasive chop saws and angle grinders, because hot steel particles embed in the paint and rust within weeks. Mark the cut on the back, support the panel on both sides, sweep every shaving away and touch up the edge with paint.How to Install Metal Eave Trim and ClosuresInstall the eave trim (drip edge) on the fascia before the panels, with underlayment lapped over its upper leg and self-adhered membrane at the edge. Fasten the trim every 12 to 24 inches, set panels to overhang it by about 1 to 2 inches, and fit foam or vented closures under the panels to block wind-driven rain, snow and pests. A hemmed panel end adds a drip edge.How to Install a Metal Ridge and Hip CapFinish the top of a metal roof by fitting profile closures or Z-closures above the last fasteners, then the ridge cap over them, lapped about 3 to 6 inches in the direction away from the prevailing wind, fastened through the panel rib or closure with sealant tape. Hips get a hip cap starting at the eave. On vented roofs leave a continuous slot with vented closures and mesh.How to Install a Metal Roof ValleyLine the valley with a 36 inch strip of self-adhered membrane, then lay a formed valley pan or W-valley over it, fastened only along its outer edges with cleats or screws outside the water path. Cut panels to the valley at an angle, hem or fold the cut edges, leave a gap of about 1 to 2 inches each side of centre and seal the panel edge with butyl tape.How to Install Standing Seam Metal RoofingStanding seam roofing is installed by squaring the first panel to the eave and rake, fastening concealed clips to the deck at the manufacturer's spacing, and engaging each panel's female seam over the previous male seam. Seams are then crimped with a hand or electric seamer. One row of clips near the ridge holds the panel, and the rest float so the panel can move with temperature.How to Use Hand Seamers and TongsHand seamers are wide-jawed pliers that bend sheet metal in a straight line, used for hems, end dams, kinks and small flashings. Mark the bend line, set the jaws square to it, squeeze with a smooth pressure along the length working in short steps, and follow the bend to the final angle. Use tongs for longer bends and to lock trim or seams.How to Bend Flashing on a Sheet Metal BrakeA portable sheet metal brake bends flat metal along a clamped line. Set the brake level and solid, cut the metal to width, mark the bend lines, clamp with the line at the bending edge, lift the apron to the angle in one smooth pull, and bend in an order that keeps each new fold clear of the tool. Use a slitter to cut coil, and protect prefinished metal from marks.

All Metal Roofing guides|The full How-To Library

This guide is general education. Always follow the product manufacturer's installation instructions, the BC Building Code and WorkSafeBC requirements, which take priority over anything written here.

Want someone to look at your roof?

Kory & Johnny have roofed homes across the Fraser Valley since 2016. Free inspections, honest estimates, no pressure.

604-728-0146Text UsEmail

Serving Hope, Agassiz, Chilliwack, Rosedale, Abbotsford & the entire Fraser Valley

$1,000 off applies to full roof replacements of 3,000 sq ft or more. Cannot be combined with other offers or previously placed orders. Not valid on partial jobs, repairs, or insurance claims.

We use cookies and the Meta Pixel. Meta receives information about your visit and uses it to measure our ads and show you ads. Decline turns it off. Privacy policy