Strip from the ridge down, pull the nails, and leave a clean bare deck. The quality of the next roof starts with how clean this one is.

  • Advanced
  • 4 to 8 hours for a typical roof
  • Updated

The short answer

Tear off a shingle roof by working from the ridge down with a shingle shovel or fork, sliding the tool under the shingles to break the nails loose and throwing debris into a bin below. Remove the underlayment, drip edge and old flashing, pull or hammer flat every leftover nail, and sweep the deck and the ground with a magnet. Strip only what can be covered the same evening.

Tearing off a roof looks like brute force, and some of it is. But a tear-off done carelessly leaves nails in the deck, gouged plywood, and debris packed in the gutters. The next roof then sits on a rough surface, nails punch through new underlayment from below, and the lawn is full of nails for years.

The technique is to get underneath the shingles and use leverage to pop the nails, not to hack at them. Work downhill from the ridge so you are always pushing material away from you, toward the bin. Take time with the deck as you go: anything left on it will end up showing through or cutting the new roof.

Before you start, read how to plan a roof tear-off for the bin, tarps and asbestos check. When the deck is bare, inspect it for rot before installing anything new.

Tools

  • Shingle shovel or tear-off fork with a serrated blade
  • Flat pry bar
  • Claw hammer
  • Cat's paw
  • Hook blade utility knife
  • Push broom
  • Magnetic roller sweeper and a hand magnet
  • Leaf blower
  • Roof jacks and planks for steep roofs
  • Rolling tarps or plywood chutes for the landing zone

Materials

  • Disposal bin sized for the roof
  • Heavy tarps for the ground and the roof
  • Nail bucket
  • Replacement plywood on hand for damaged deck
  • Temporary tarps and lumber for drying in
  • Trash bags for small debris

Safety first

  • Fall protection is required where a fall could be 3 metres (about 10 feet) or more. Loose shingles on a bare deck are slick, so keep your harness tied off and your footing clean.
  • Wear eye protection, gloves and a dust mask or respirator. Old roofs throw off grit, mold spores and fibreglass, and pre-1990 roofs may contain asbestos that must be tested before you disturb it.
  • Never work below another person on the roof. Shingles and nails can fall and fly several metres.
  • Keep the no-go zone under the eaves clear of people and pets, and call out when you are about to throw debris.

Step by Step

  1. Step 1: Set up anchors, jacks and landing zone

    Install anchors at the ridge into framing and rig lifelines so you can move without re-tying each time. On pitches above about 6/12, add roof jacks and toe boards so you have a platform to stand on while stripping. The patched nail holes from jacks are covered by the new roofing.

    Put tarps or plywood against walls and over plants, and check the bin is within reach of the edge. Recheck the forecast. A section stripped in the morning needs to be dry by evening.

  2. Step 2: Remove the ridge and hip caps first

    Slide the shovel under the cap shingles at the ridge and pry them up, cutting through any adhesive strips. If the ridge has a ridge vent, pull the vent and the nails out before stripping down. Drop the caps down the slope toward the bin.

    Starting at the top lets gravity carry debris away from you. Stripping from the bottom means climbing over loose shingles and dragging debris uphill.

  3. Step 3: Strip the field shingles in rows, working downhill

    Angle the shovel under the shingle edge, just above the nail line, and push down on the handle so the blade lifts the shingle and pops the nails out. Move along the row, then step back and push the pile down the slope. Work in a line across the roof rather than digging in one spot.

    Let the nails come with the shingles where they will. A flat shovel with serrations catches nail heads, which saves pulling each one by hand. Keep your weight over your feet and your footing on stripped deck or solid shingles, never on a loose pile.

    Tip: Keep the blade low and flat. A shovel pried up steeply gouges the plywood and dents the surface the new underlayment sits on.

  4. Step 4: Deal with a second or third layer

    With two layers, the nails are longer and the shingles are often stuck together with tar, so the shovel does more work and the debris is twice as heavy. Some roofers take both layers together, and some take them one at a time, which keeps the plywood cleaner. Either way, check the bin weight before loading.

    The bottom layer often hides the damage. Decking under old layers is the most likely place to find rot, nail-sick plywood and brittle boards. Take more time here.

  5. Step 5: Remove underlayment, drip edge and old flashing

    Old felt tears into strips that stick to the deck. Peel and scrape it off, and remove staples or cap nails left behind. Pull the old drip edge and the old step flashing and kickouts. Reusing old flashing is a common shortcut that comes back later as leaks.

    Cut or remove the old roof vents, and take out the plumbing boots and vent pipes' flashings to be replaced. Scrape cement from the deck around chimneys and penetrations.

  6. Step 6: Pull or flatten every nail in the deck

    Use the claw of a hammer or a cat's paw to pull any remaining nails. Nails that will not pull are driven flush with the hammer, but pulling is better because a nail head sitting up leaves a bump under the new membrane. Check the eaves and rakes especially, because those nails are the ones that get missed when the shovel cannot reach.

    Nail holes in the plywood are fine. Bad surface damage, splintered edges and crumbling panels are not, and are covered in how to replace rotten roof sheathing.

  7. Step 7: Sweep the deck and clear the gutters

    A push broom followed by a leaf blower takes off granules and grit. Do not sweep debris into the gutters. If it happens, scoop it out now, because it is much harder once the new roof is on. Keep the work tidy, because new underlayment and ice and water shield will not stick to a dusty deck.

  8. Step 8: Magnet-sweep the ground and the driveway

    Make several passes in a grid pattern, including under the eaves, along the walls, and around the bin. A nail in a lawn or a driveway becomes a flat tire. Magnetic sweepers pick up surprising numbers of nails after every tear-off, so this step is not optional.

    Check the bin area, the route the truck takes out, and any gravel or soft ground where nails can hide.

  9. Step 9: Inspect, dry in and protect the open deck

    Before anything is installed, walk every panel and mark soft spots or stains. The method is in how to inspect a roof deck for rot. Then cover the deck with ice and water shield and underlayment, or with tarps if the roof will sit open. See how to dry in and tarp a roof overnight.

Tear-Off Tools and What Each Does

  • Shingle shovel or fork: the main tool. A serrated blade bites under the shingle and pops nails. Forks are lighter and better on single layers.
  • Flat bar: for stubborn eaves, ridges and flashing.
  • Cat's paw: pulls single nails flush with the deck.
  • Magnetic sweeper: for the ground and the bin area. Use a hand magnet on the deck edges and in gutters.

Fraser Valley Notes

Old roofs in this climate often carry moss and wet needle debris that makes the surface slippery in the morning, so wait for the surface to dry before you start. Under the moss, eaves and north-facing slopes are the first places to show rotten decking, because they stay wet longest. Plan extra plywood for those areas.

Common Mistakes

  • Stripping from the eave upward. You end up climbing over loose shingles and pushing debris uphill. Start at the ridge and work down.
  • Gouging the deck with a steep shovel angle. Damaged plywood holds moisture and gives a rough base for new underlayment.
  • Leaving nails in the deck. Every nail head sitting proud of the surface pushes up through new underlayment or punctures it.
  • Skipping the magnet sweep. Nails in the lawn and driveway cause flat tires and injuries long after the job.
  • Stripping more than can be covered. A section left open at dusk is a leak waiting for overnight rain.
  • Reusing old flashing. Rust, bad laps and wrong sizes all carry over to the new roof.

When to Call a Professional

If the roof is steep, more than one storey up, has multiple layers, or may contain asbestos, call a roofing contractor. The fall risk and the weight of the debris are both high, and asbestos must be tested before it is disturbed.

A contractor also has the bins, the anchors, the sweeper and the plan to dry in. If you start a tear-off yourself and the weather turns, the roof is open and you are racing for tarps.

Fraser Roofing does free roof inspections across the Fraser Valley, from Hope to Abbotsford. See our Roof Replacement service or the towns we cover.

How to Tear Off an Old Shingle Roof: Questions

How do you tear off a shingle roof?

Start at the ridge and work downhill. Slide a serrated shingle shovel under the shingles just above the nail line and lever upward so the nails pop free, then push the debris toward a bin at the eave. Remove underlayment and flashing, pull leftover nails from the deck, sweep it clean, and run a magnet over the ground.

Can you leave the old underlayment when installing a new roof?

It is generally removed. Old felt is brittle, wrinkled and stuck to the deck, and it hides any damage to the plywood below. New underlayment lies flat on a clean deck and sticks properly. Removing it also lets you see stains, soft spots and old nail damage that need repair before the new roof goes on.

How many layers of shingles can you have on a roof?

Many codes allow a maximum of two layers of asphalt shingles, but the allowance depends on the local code and the structure. More layers add weight, hide rot, and shorten the life of the top layer. Most roofers prefer a full tear-off. Check the local building code and the shingle manufacturer's instructions.

How do you get all the nails after a roof tear-off?

Use a magnetic roller sweeper over the lawn, beds, driveway and street in a grid pattern, and a hand magnet around the bin and along the eaves. On the deck, pull or hammer flat any nail left behind. Tarps under the work zone catch most nails, and a blower clears grit from the gutters.

How long does it take to tear off a roof?

A typical single-layer roof of 25 to 35 squares takes one crew about a day to strip, depending on pitch, layers and access. Second layers, steep pitches and deck repairs take longer. Stripping should be limited to what can be covered by evening, so large roofs are often done in sections.

Related Guides

How to Plan a Roof Tear-OffPlan a tear-off by sizing the bin to the roof (about 1 ton of debris per 7 squares of single-layer shingles), placing it under the eave where you can throw or chute straight in, covering landscaping and vents, checking older roofs for asbestos before disturbing them, and only stripping as much roof as can be dried in before nightfall. Check the forecast and warn the neighbours.How to Inspect a Roof Deck for RotInspect a roof deck after tear-off by walking every panel, pressing with a screwdriver and your weight to find soft spots, checking the underside from the attic for stains and daylight, and looking for delaminated plywood, crumbling edges, deflection between rafters and loose or rusted fasteners. Replace any panel that is soft, delaminated or stained through, cutting back to the centre of a rafter.How to Replace Rotten Roof SheathingTo replace rotten roof sheathing, cut the damaged panel out along the centre of the rafters, pull nails, and install a new panel of the same thickness with its long edge across the rafters. Leave a 1/8 inch gap at panel edges, add H-clips between rafters, and nail every 6 inches at edges and 12 inches in the field with 2-1/2 inch nails. Common thicknesses are 7/16 OSB or 1/2 inch plywood.How to Dry In and Tarp a Roof OvernightDry in an open roof by covering bare deck before nightfall with self-adhered membrane or properly lapped underlayment, taped and capped at the edges, or with heavy tarps over the ridge and fastened to lumber strips, not through the tarp alone. Overlap tarps from the ridge down, weigh and batten them against wind, close off open edges and penetrations, and check the forecast before stripping any section.How to Use a Roofing Shovel for Tear-OffA roofing shovel, or shingle fork, is a long-handled tool with a serrated flat blade that slides under shingles and lifts them and their nails off the deck. Start at the ridge, work in rows down the slope, push the blade under the shingles at a low angle, lever up against the nails, and clear debris downslope to a controlled drop zone. Stay tied off and watch your footing on loose debris.How to Install Roof Jacks and Toe BoardsRoof jacks are steel brackets nailed through the shingles into the rafters to hold a plank that gives a level working platform on a steep roof. Find the rafters, nail each jack with the fastener count the manufacturer specifies, seat a straight, knot-free plank on the jacks, check it by bouncing your weight, and remove the jacks at the end, sealing every nail hole. They are a platform only and do not replace fall protection.How to Install a Roof AnchorA temporary roof anchor is a steel plate with a D-ring, nailed through the shingles into the rafters near the ridge so a lifeline can clip to it. Find the rafter, fit the anchor in line with the work area, drive every specified fastener into solid framing, and never rely on the sheathing alone. Fall arrest anchors must be rated for at least 22 kN (5,000 lb) unless an engineer designs otherwise.How to Install Drip EdgeInstall drip edge by fastening it directly to the bare deck at the eaves, then laying ice and water shield and underlayment over its top flange. At the rakes, put the underlayment down first and fasten the drip edge over it. Lap joints about 2 inches, nail along the top flange about every 12 inches, and cut mitres at corners so water is directed into the gutter and away from the fascia.

All Tear-Off, Decking and Underlayment guides|The full How-To Library

This guide is general education. Always follow the product manufacturer's installation instructions, the BC Building Code and WorkSafeBC requirements, which take priority over anything written here.

Want someone to look at your roof?

Kory & Johnny have roofed homes across the Fraser Valley since 2016. Free inspections, honest estimates, no pressure.

604-728-0146Text UsEmail

Serving Hope, Agassiz, Chilliwack, Rosedale, Abbotsford & the entire Fraser Valley

$1,000 off applies to full roof replacements of 3,000 sq ft or more. Cannot be combined with other offers or previously placed orders. Not valid on partial jobs, repairs, or insurance claims.

We use cookies and the Meta Pixel. Meta receives information about your visit and uses it to measure our ads and show you ads. Decline turns it off. Privacy policy