How to Replace Rotten Roof Sheathing: Cutting Out, Sizing and Fastening New Panels
Cut back to the middle of a rafter, match the thickness, leave the gap and nail it properly. A patched deck should be as stiff as the rest.
- Advanced
- 1 to 4 hours for a few panels
- Updated
The short answer
To replace rotten roof sheathing, cut the damaged panel out along the centre of the rafters, pull nails, and install a new panel of the same thickness with its long edge across the rafters. Leave a 1/8 inch gap at panel edges, add H-clips between rafters, and nail every 6 inches at edges and 12 inches in the field with 2-1/2 inch nails. Common thicknesses are 7/16 OSB or 1/2 inch plywood.
Replacing a rotten panel looks simple, but a patch is only as good as its edges. A new panel that is too thin, not nailed to the rafters or left butted tight will show up later as a dip, a ridge or a cracked shingle row. Properly done, the repair is invisible under the new roofing and as stiff as the rest of the deck.
Sheathing is the structural skin of the roof. It spreads loads between rafters, holds the fasteners for everything above and closes the attic. The key numbers are thickness, panel edge support, the gap at the edges and the nailing schedule. The right thickness depends on rafter spacing, local code and the roofing above, so confirm it against the BC Building Code Part 9 and the roofing manufacturer's instructions.
This guide covers cutting and replacing panels. To decide what needs replacing, read how to inspect a roof deck for rot. For old spaced boards, see how to resheet over plank decking.
Tools
- Circular saw with a carbide blade
- Reciprocating saw
- Pry bar and claw hammer
- Coil nailer or framing hammer
- Chalk line
- Speed square
- Tape measure
- Utility knife
- Flat shovel for scraping
Materials
- Plywood or OSB roof sheathing matching the existing thickness
- H-clips sized for the sheathing
- Ring-shank or smooth shank nails, 2-1/2 inch (8d), hot dip galvanized or ring-shank
- 2 by 4 blocking or cleats where edges are unsupported
- Sistering lumber for damaged rafters
- Wood screws for tacking
Safety first
- Stay tied off at all times. Cutting out panels leaves holes, and a missing panel is a hole to the floor below.
- Set the circular saw blade depth to just the thickness of the sheathing, about 1/2 inch, so you do not cut into the rafters or roofing below.
- Cover or barricade open holes at the end of each work period. A person stepping into a panel-size opening can fall straight to the floor.
- Wear eye and hearing protection. Cutting old, dirty sheathing throws dust and splinters.
Step by Step
Step 1: Mark the damage and the rafter lines
Mark the area to be removed in crayon, including a margin of sound wood. Locate the rafters from the old nail lines on adjacent panels and from the attic, then snap chalk lines over the rafter centres so your cut ends on the middle of a framing member. A rafter at 16 inches on centre is about 1-1/2 inches wide, so the cut must be accurate enough to leave about 3/4 inch on each side for the two panels to land.
Decide on the new panel size. Whole-sheet replacement is stronger and easier to fasten than a patch, but cutting back to the nearest rafters on each side is fine.
Step 2: Set the saw depth and cut out the bad panel
Set the blade depth to the thickness of the sheathing plus a hair. Cutting deeper nicks the rafters and can cut into the roofing or ceiling material below. Make cuts along the chalk lines, finishing corners with a reciprocating saw. Pry the piece out with a flat bar, working gradually so that adjacent panels are not damaged.
Pull all nails out of the rafters. Clean off the framing with a scraper. Look at the rafters themselves. If the top edge is soft or rotten, repair or sister them before installing the new panel.
Watch out: Do not cut over an area you cannot see the underside of. Know what is below the cut line, such as wiring, pipes or bath fans.
Step 3: Add blocking where the edges are not supported
When you cut along a line that falls between rafters, the edge has nothing under it and will flex. Fit blocking of 2 by 4 between the rafters along the cut, flush with the top of the rafter, and nail through the rafters with two nails at each end. Alternatively, use H-clips on the new panel's unsupported edge.
For thinner sheathing, the code and the panel manufacturer have rules about edge support. If the roof has tongue-and-groove panels, the joint between panels supports the edge. Standard panels are not tongue-and-groove, so clips or blocking are needed.
Step 4: Choose the right panel thickness and type
Roof sheathing is sold as plywood (CSP, Douglas fir or CSA O121 and O151 grades) or OSB (CSA O325 or O437). Typical new roofs use 7/16 inch OSB or 1/2 inch plywood on rafters at 24 inches on centre, with 3/8 inch plywood or 7/16 OSB seen at 16 inches. Those are above the BC Building Code minimums, which for plywood and O-2 OSB are 9.5 mm (3/8 inch) at 24 inch spacing with the edges supported by H-clips or blocking, 12.5 mm (1/2 inch) with unsupported edges, and 9.5 mm at 16 inch spacing without edge support. Thicker panels such as 5/8 inch are used for long spans, heavy snow and some roofing types, including low-slope roofing, where 1/2 inch plywood at 16 inch and 5/8 inch at 24 inch spacing is a common rule. Confirm for your roof in BC Building Code Part 9 and with the shingle maker.
Plywood holds nails well and dries faster, and it is less sensitive to wet edges. OSB is cheaper and common. Both are acceptable for shingles when rated for roof use. Whichever you choose, match the thickness of the neighbouring panels so the deck is flat, because a thin patch creates a dip and a thick patch creates a ridge.
Tip: If the old deck is 3/8 inch and you fit 1/2 inch, shim the thinner area or replace the whole row. Level beats speed.
Step 5: Lay the panel across the rafters with staggered joints
Set the panel's long dimension perpendicular to the rafters, with the face grain or strength axis across the supports. End joints must land on the centre of a rafter, and adjacent rows should be staggered so the joints do not line up. Stagger at least one rafter space between rows.
Hold the panel tight to the old deck, then back it off slightly for the gap in the next step.
Step 6: Leave the expansion gap and set H-clips
Wood panels swell and shrink with moisture. Panels butted tight buckle upward in humid weather, telegraphing through shingles as ridges. A gap of 1/8 inch at all edges and ends gives them room. A 16 penny nail is a fast spacer. Panels are usually manufactured about 1/8 inch under size to help.
H-clips are small metal clips that slip over the edge of two panels between rafters, supporting the joint and keeping the gap. Use one per rafter span along unsupported long edges, and for 24 inch spacing, one between rafters. Use the clip size matching your panel thickness.
Step 7: Nail to the schedule
Use 8d (2-1/2 inch) ring-shank or galvanized nails at 6 inches on centre at supported panel edges, and 12 inches on centre into intermediate rafters. The BC Building Code's basic schedule is 150 mm (6 inches) at the edges and 300 mm (12 inches) at intermediate supports with nails at least 51 mm (2 inches) long, and tighter schedules apply in high wind and seismic locations, so confirm it for your location and the thickness of the panel. Keep nails at least 3/8 inch from panel edges.
Drive nails flush. Overdriven nails crush the surface and lose holding power, and underdriven nails stand proud and punch through underlayment. A pneumatic nailer with depth control makes this easier.
Step 8: Check the deck is flat and continuous
A lip at a joint shows through shingles as a line. Plane down high edges, or shim low areas, or pull and reset a panel that is off. Check the new panels do not bounce. If they do, add blocking or fasteners. Then the deck is ready for ice and water shield and underlayment.
Plywood or OSB
- Plywood: holds nails well, handles wet edges better, stays flatter after a soaking, and costs more.
- OSB: cheaper and widely used, but edges swell if they get wet and do not fully recover.
- Either: must be rated for roof sheathing and match the thickness of the existing deck.
- Avoid: unrated or interior-grade panels, and mixing thicknesses on one slope.
Fraser Valley Notes
The coast climate keeps decks damp for months, so panel edges matter. Prime or seal cut edges of exposed panels if they will sit open in fall. Eaves and valleys are the most common places to need sheathing replaced. Since rain can soak new OSB before it is covered, dry in promptly. See how to dry in and tarp a roof overnight.
Common Mistakes
- Butting panels tight. With no gap, panels swell and buckle, and the ridge shows through the shingles.
- Using the wrong thickness. A thin patch dips, a thick one ridges, and either one is visible under the new roof.
- Ending cuts between rafters with no support. Unsupported edges flex and crack shingles and underlayment.
- Overdriving or underdriving nails. Crushed surfaces hold poorly and proud nail heads puncture the underlayment.
- Lining up end joints in adjacent rows. It makes a weak line across the deck.
- Patching over rotten rafters. New sheathing nailed to soft framing will not hold.
When to Call a Professional
If more than a few panels are bad, if rafters are rotten, if the deck sags or if the work is on a steep or high roof, call a roofing contractor. Replacing structural sheathing is also a code matter, so work that goes beyond simple patching may need a permit or an engineer.
Ask for the price per sheet in writing so extra rotten panels found during tear-off are not a surprise.
Fraser Roofing does free roof inspections across the Fraser Valley, from Hope to Abbotsford. See our Roof Replacement service or the towns we cover.
How to Replace Rotten Roof Sheathing: Questions
What thickness of plywood should I use for roof sheathing?
Common choices are 7/16 inch OSB or 1/2 inch plywood on rafters at 24 inches on centre, and 3/8 to 1/2 inch plywood at 16 inches. Low-slope roofs and heavy snow areas often call for 5/8 inch at 24 inches. Match the thickness of the existing deck and confirm against the BC Building Code and the roofing manufacturer.
What are H-clips for on roof sheathing?
H-clips are small metal clips that fit over the edges of two adjoining panels between rafters. They support the unsupported edges so one panel cannot sag below the other, and they keep the small expansion gap between panels. They are used on panels that are not tongue-and-groove, usually one clip per rafter space.
How far apart should you nail roof sheathing?
A common schedule is 2-1/2 inch (8d) nails every 6 inches along panel edges and every 12 inches in the field into the rafters. Keep nails about 3/8 inch from the edge and drive them flush. Confirm the schedule against the BC Building Code and the panel manufacturer for your roof.
Why leave a gap between roof sheathing panels?
Wood panels swell when they absorb moisture and shrink when they dry. A gap of about 1/8 inch at the edges and ends gives them room to expand. Without the gap, panels push against each other and buckle upward, which shows through the shingles as visible ridges and can lift nails.
Is plywood or OSB better for roof sheathing?
Both are approved when rated for roofs. Plywood holds nails better, handles wet edges better and stays flatter after wetting, but costs more. OSB is less expensive and widely used, but its edges swell when soaked and do not fully recover. In a wet climate, keep either one covered quickly after installation.
Related Guides
All Tear-Off, Decking and Underlayment guides|The full How-To Library
This guide is general education. Always follow the product manufacturer's installation instructions, the BC Building Code and WorkSafeBC requirements, which take priority over anything written here.
Want someone to look at your roof?
Kory & Johnny have roofed homes across the Fraser Valley since 2016. Free inspections, honest estimates, no pressure.
604-728-0146Text UsEmailServing Hope, Agassiz, Chilliwack, Rosedale, Abbotsford & the entire Fraser Valley