Get $1,000 off a full roof replacementSee offer terms. Get started
Roofing Resources
Blog

How to Reseal Lifted or Unsealed Shingles With Roofing Cement

Small dabs, in the right places, in mild weather. Why shingles lift, and when resealing is the wrong fix.

  • Advanced
  • 1 to 3 hours
  • Updated

The short answer

To reseal lifted asphalt shingles, work on a dry day above about 10 degrees Celsius, lift each loose tab gently, put a dab of asphalt roofing cement about the size of a quarter under each lower corner, and press the tab down. Use small amounts, since too much blisters the shingle. If shingles are cracked, curling or brittle, repair or replacement is better than resealing.

Asphalt shingles are held down by a strip of factory sealant that activates with the sun's heat. When the sealant bonds, the shingle lies flat and resists wind. When it does not, the tab lifts, flaps in wind and finally creases or blows off. Lifted shingles are one of the most common storm repairs in the Fraser Valley after a strong windstorm.

Shingles fail to seal for several reasons. Some were installed in cold weather and never had enough heat to activate the strip. Others collected dust and debris on the strip before being laid. Older shingles lose sealant strength with age, and shingles laid on a dirty or wet surface may not bond. In some cases, wind breaks a bond that was already weak.

Hand sealing is a small fix that works well on shingles that are otherwise sound. It does not repair a cracked or curled shingle, see how to replace a damaged shingle for those. To find out how much damage a storm caused, start with how to check your roof after a windstorm.

Tools

  • Caulking gun
  • Putty knife
  • Flat bar
  • Binoculars
  • Extension ladder with stabilizer
  • Roofing harness and anchor (for steep or high roofs)

Materials

  • Asphalt roofing cement in cartridges (plastic roof cement)
  • Galvanized roofing nails, 1-1/4 inch, for nailing where needed
  • Rags and mineral spirits for cleanup

Safety first

  • Go up only on a dry day, and never on a wet, frosty or mossy roof.
  • WorkSafeBC requires fall protection where a fall could be 3 metres (about 10 feet) or more. On a steep or high roof, this job is one for a roofer with proper equipment.
  • Roofing cement is sticky and flammable. Keep it off your hands and boots, since tracked cement makes the ladder slippery, and keep it away from open flames.

Step by Step

  1. Step 1: Find the lifted shingles from the ground

    Lifted tabs throw a shadow along their lower edge, especially in low sun. Look on the windward slopes and near the eaves, rakes and ridge, where wind pressure is highest. Mark where they are so you can go straight to them.

    Note whether the shingles are merely unsealed or also damaged. A crease across the tab means the shingle is broken and will not lie flat.

  2. Step 2: Choose dry, warm weather and set up safely

    In cold weather, shingles are stiff and crack when lifted, and cement does not stick well. Ideal weather is mild, dry and with the roof surface dry. Avoid the heat of a summer afternoon when the shingles scuff easily under your boots.

    Watch out: If the roof is steep or above the first storey, hire a roofer. A fall is a far bigger cost than the repair.

  3. Step 3: Clean the contact surfaces

    Cement sticks to clean asphalt and fails on dust. Use a dry brush or a cloth. If the surface is wet or has moss on it, wait for a drier day or have it cleaned first.

    Do not bend the tab far. If it is stiff, let it warm in the sun or move on to another tab and return.

  4. Step 4: Apply small dabs of roofing cement

    Most manufacturers recommend spots of cement about 1 inch in diameter, placed near the corners, with two to four dabs per shingle depending on the product. More is not better. A big smear squeezes out, traps dirt and moisture, and can cause blisters in the shingle above and below.

    Use a putty knife or the tip of the caulking gun nozzle to place the dab. Check the cement manufacturer's instructions and the shingle bundle wrapper for the spacing they call for.

  5. Step 5: Press the tab down and hold it

    Press for several seconds so the cement bonds and spreads slightly under the tab. On a windy day, you may need to hold it a little longer. Wipe away any cement that oozes out, using a dry rag, before it collects dirt.

  6. Step 6: Check for nail problems under the lifted shingle

    A popped nail props up the shingle above it. See how to fix exposed and popped nails. Sealing a shingle over a raised nail head will not hold, and the nail will wear through the tab.

  7. Step 7: Recheck after wind and sun

    Repairs that hold lie flat with no shadow along the bottom edge. Any shingle that lifts again is usually old, brittle or has a bigger problem. If many shingles across a slope will not stay sealed, the roof may be reaching the end of its life.

Why Shingles Fail to Seal

The factory sealant strip needs warm sun to soften and bond to the shingle below. Shingles laid late in the year in cool, damp weather may never seal, and in the Fraser Valley many roofs are installed in autumn. Dust and debris on the strip from storage or a dirty roof stop it bonding. As roofs age the sealant loses strength, and heat and cold cycles slowly work the bond loose.

When Resealing Is Not Enough

If the shingle is cracked, torn, curled or has lost most of its granules, resealing just holds a failed shingle in place. Widespread lifting across slopes points to old age or poor installation. A roofer can tell whether the roof can be repaired or is better replaced, and will check the nailing pattern, which may be too high or too few, see shingle nailing placement, count and depth.

Common Mistakes

  • Using too much cement. Big smears trap moisture and blister shingles. Quarter-sized dabs are enough.
  • Working in the cold. Stiff shingles crack when lifted and cement does not bond.
  • Sealing over a raised nail. The nail keeps the tab up and will wear through it.
  • Using the wrong product. Use asphalt roofing cement made for shingles, not general caulking or silicone, which may not stick to asphalt.
  • Gluing a broken shingle. A creased or torn tab will not hold, and needs replacing.
  • Not cleaning the surfaces. Cement does not stick to dust, moss or wet asphalt.

When to Call a Professional

Call a roofer if the lifted shingles are on a steep or high roof, if the shingles are brittle and crack when touched, if lifting is widespread across slopes, or if you can see missing shingles or exposed underlayment.

A roofer can also judge whether the roof has enough life to justify repairs, and will check the nailing, flashing and ventilation, which are often the real causes of shingles that will not stay down.

Fraser Roofing does free roof inspections across the Fraser Valley, from Hope to Abbotsford. See our Emergency Roof Repair service or the towns we cover.

How to Reseal Lifted or Unsealed Shingles: Questions

Why are my shingles not sealing down?

The factory sealant strip needs warm sun to bond. Shingles installed in cold weather may never seal, dust on the strip prevents bonding, and sealant weakens as a roof ages. Wind can also break an existing bond. In the Fraser Valley, roofs laid in late autumn are common cases of shingles that do not seal until the next warm spell.

How much roofing cement should I use under a shingle?

A dab about the size of a quarter, roughly 1 inch across, under each lower corner, with two to four dabs per shingle depending on the product. Check the manufacturer's instructions. More cement does not hold better. Large smears trap moisture and dirt, and can blister the shingles above and below.

Can I use caulking or silicone to seal shingles?

It is better to use asphalt roofing cement, often sold as plastic roof cement, which bonds to asphalt shingles and stays flexible. General-purpose caulks and silicone may not stick to asphalt and can stain the surface. Always follow the shingle and cement manufacturers' instructions for the product you are using.

Will lifted shingles reseal on their own?

Sometimes. If the strip is clean and the shingle lies flat, a warm sunny spell can reactivate the sealant. If dust, age or a raised nail is the problem, it will not. A shingle that keeps lifting needs hand sealing, and one that is cracked or curled needs replacing.

What temperature do shingles seal at?

Most asphalt shingle sealant strips activate from sun and surface heat, and the usual guidance is that mild, sunny weather, often above about 10 degrees Celsius, is needed. The exact figure varies by product, so confirm it on the bundle wrapper. In winter, hand sealing with roofing cement gives wind protection that the strips cannot.

Related Guides

How to Replace a Damaged ShingleTo replace a damaged asphalt shingle, lift the shingles above to break their sealant strips, pull the nails holding the damaged shingle and the row above it with a flat bar, slide the damaged piece out, slide a matching shingle into place, nail it with four roofing nails just under the overlying course, then hand seal the tabs with dabs of asphalt roofing cement. Do this only in dry, mild weather.How to Fix Exposed and Popped NailsA popped roofing nail is a nail that has backed partly out of the deck and pushed up the shingle above it. To fix it, lift the shingle, pull the nail and drive a new galvanized roofing nail a short distance away, or if the hole is unused, seal it with a dab of asphalt roofing cement. Do not just hammer the old nail back down, and do not smear sealant over the head alone.How to Check Your Roof After a WindstormAfter a windstorm, check your roof from the ground in daylight: look at the yard for shingle pieces, then scan each slope with binoculars for missing, creased or lifted shingles, damaged ridge cap, bent flashing and loose vent covers. Check the attic and ceilings for new stains. Photograph everything with dates. Do not climb onto a roof that may be damaged, wet or unstable.Shingle Nailing: Placement, Count and DepthNail in the marked nailing zone, where the shingle is doubled, not above it or in the exposed tab. Use 4 nails per shingle as standard and 6 on steep roofs or in high wind, per the manufacturer. Use galvanized roofing nails at least 1-1/4 inch long that penetrate 3/4 inch into the deck or through it. Drive them flush and straight, never proud or crushing the shingle.How to Shingle in Cold WeatherIn cold weather shingles crack when bent and the factory sealant strips will not bond until the sun warms them, so hand seal tabs with asphalt roof cement, especially at eaves, rakes and ridges. Keep bundles warm until used, cut and bend slowly, raise nailer pressure as needed and test on scrap. Below freezing or with frost on the deck, wait.How to Lay Shingle Courses and OffsetsLay the first full course over the starter, flush with the rake, then build each course up the roof at the printed exposure (about 5-5/8 inches for laminated shingles), offsetting joints at least 4 to 6 inches from the course below so no joint lines up within two courses. Blend bundles, keep to the chalk lines, nail in the zone, and trim at the rake after the course is down.

All Roof Repair guides|The full How-To Library

This guide is general education. Always follow the product manufacturer's installation instructions, the BC Building Code and WorkSafeBC requirements, which take priority over anything written here.

Want someone to look at your roof?

Kory & Johnny have roofed homes across the Fraser Valley since 2016. Free inspections, honest estimates, no pressure.

604-728-0146Text UsEmail

Serving Hope, Agassiz, Chilliwack, Rosedale, Abbotsford & the entire Fraser Valley

$1,000 off applies to full roof replacements of 3,000 sq ft or more. Cannot be combined with other offers or previously placed orders. Not valid on partial jobs, repairs, or insurance claims.

We use cookies and the Meta Pixel. Meta receives information about your visit and uses it to measure our ads and show you ads. Decline turns it off. Privacy policy