Get $1,000 off a full roof replacementSee offer terms. Get started
Roofing Resources
Blog

How to Install Cedar Shakes: Sheathing, Interlay Felt, Exposure, Keyways and Nails

A cedar roof sheds water through spaced, overlapping wood. The numbers that matter are exposure, keyways, offsets and the felt.

  • Professional
  • 2 to 5 days for an average roof
  • Updated

The short answer

Cedar shakes go on spaced or solid sheathing with a doubled starter course, 18 inch wide strips of 30 pound interlay felt laid between courses, keyways of about 3/8 inch between shakes offset at least 1-1/2 inches from the course below, and two corrosion-resistant nails per shake about 3/4 inch from the edges and 1-1/2 inches above the exposure line. Common maximum exposures are 7-1/2 inches for 18 inch shakes and 10 inches for 24 inch shakes.

A cedar shake roof is a layered system. Unlike asphalt shingles, which seal into a solid sheet, shakes are spaced so the wood can swell when wet and dry out between rains. Water runs down the face of each shake and off the lower edge, and the overlapping courses keep it from reaching the roof deck. Correct spacing, offsets and ventilation are what make a cedar roof last decades. Get them wrong and the roof leaks, cups and rots early.

The Fraser Valley has many older cedar roofs, and a new one is a real option for owners who want the look, but it is demanding work with rules of its own. The figures in this guide follow the common practice published by the Cedar Shake and Shingle Bureau, and manufacturers' and local code requirements govern. Always confirm the numbers for your product and municipality before starting.

Cedar shakes and cedar shingles are different products. Shakes are thicker, with a split or rough face, and they take interlay felt. Shingles are sawn smooth and are laid without interlay. This guide is about shakes. For small repairs, see how to replace a cedar shake. When a shake roof on spaced boards is later replaced with shingles, the boards have to be covered, see how to resheet over plank decking.

Tools

  • Roofing hatchet or hammer
  • Shake or shingle hatchet
  • Chalk line
  • Tape measure
  • Utility knife
  • Circular saw or handsaw for trimming
  • Nail gun suited to stainless or galvanized shake nails (optional)
  • Roofing harness, rope and roof anchors

Materials

  • Cedar shakes (18 or 24 inch, tapersawn or split and resawn, or hand-split)
  • 30 pound roofing felt, cut into 18 inch strips for interlay
  • Underlayment or solid sheathing paper as the design requires
  • Hot-dip galvanized or stainless steel nails
  • Metal flashing, drip edge and ridge materials
  • 1 by 4 or 1 by 6 boards for spaced sheathing, if used

Safety first

  • Wood shakes are slippery when damp, frosty or mossy, and steep roofs are common. WorkSafeBC requires fall protection where a fall could be 3 metres (about 10 feet) or more. Use anchors, harnesses and lifelines from the start.
  • Tear-off of an old wood roof produces nails, splinters and heavy waste. Wear gloves, eye protection and sturdy boots.
  • Check local building and fire rules before you start. Many BC municipalities restrict or regulate wood roofing because of wildfire risk, and fire-retardant treated shakes or a particular underlayment may be required.

Step by Step

  1. Step 1: Confirm the slope, the rules and the product

    Shakes generally need a steeper roof than asphalt shingles, commonly not less than 4/12 for shakes and 3/12 for cedar shingles, but confirm the requirement for your product. On lower slopes, shakes are not suitable. Check with your municipality about fire ratings and any approved underlayments.

    Common shake lengths are 18 inches and 24 inches. The length sets the exposure. Buy about 10 to 15 percent extra for waste and trimming, since shakes split and vary in width.

  2. Step 2: Prepare the sheathing and underlayment

    Spaced sheathing lets air circulate under the shakes so they dry quickly, and boards are commonly spaced on centre at the same distance as the shake exposure, so each shake is nailed to a board. Solid sheathing is also used, and often with an air space or ventilated batten system, which helps the wood dry. Follow the design for your roof and the manufacturer's advice. See how to install drip edge.

    Where ice and water protection is required at eaves and valleys, install it first, see how to install ice and water shield.

  3. Step 3: Lay a doubled starter course

    The starter course is laid in two layers so the water at the eave has a thicker path to follow. Overhang the fascia or drip edge by about 1-1/2 inches so water drips clear of the wall. Offset the joints between the two layers by at least 1-1/2 inches. Use a chalk line to keep the butts straight.

  4. Step 4: Space the shakes and offset the keyways

    The gap between shakes is called a keyway. It has to be wide enough for the wood to swell without buckling, and narrow enough that water does not run straight through. The Cedar Shake and Shingle Bureau manual gives 3/8 to 5/8 inch, and the BC Building Code gives 6 to 9 mm (about 1/4 to 3/8 inch) for shakes, so about 3/8 inch satisfies both. Keyways that line up in adjoining courses create a path for water, so each must be offset by at least 1-1/2 inches from the joints in the course below, and not line up with the next course either.

    Trim shakes as needed to keep the offset, and avoid slivers narrower than about 4 inches, which split and blow off (the BC Building Code sets a 100 mm minimum shake width). Mix widths as they come out of the bundle so keyways fall naturally out of line.

  5. Step 5: Interlay each course with felt

    Interlay is what stops wind-driven rain from being blown up the slope between shakes. The felt sits over the top portion of the lower course and under the shakes above, with its lower edge set above the butt line at a distance equal to twice the weather exposure. For 24 inch shakes at 10 inch exposure, that is 20 inches above the butt. Felt is used with shakes, but not under tapersawn shakes or shingles with no air gap, which can trap moisture.

    Cover the felt with the next course, and never let it stick out where it would show or trap water.

  6. Step 6: Maintain the correct exposure

    Exposure is the visible part of the shake. Maximum exposure limits exist for roofs because more exposure means less overlap and less protection. Common figures from the Cedar Shake and Shingle Bureau for roof slopes of 4/12 and up are 7-1/2 inches for 18 inch shakes and 10 inches for 24 inch shakes. Lower exposures are used on lower slopes. Confirm against the manufacturer and your local requirements.

    Snap a chalk line for each course, or use a straight board as a guide, so the butt line stays level.

  7. Step 7: Nail each shake with two corrosion-resistant nails

    Place the nails so that the next course covers their heads. Driving them too high means they are not covered, and too low means they miss the boards. Use nails long enough to pass through the shake and into the sheathing, such as a 3d to 5d shake nail, with stainless recommended in very wet or salt-air conditions. Never use bright steel nails, which rust and stain. Do not overdrive, which splits the wood and lets the shake cup.

    Watch out: Do not face nail near the exposed edge. It splits the shake and leaves a leak path.

  8. Step 8: Flash the details and finish the ridge and hips

    Valleys, chimneys, skylights and walls need metal flashing set in place as the courses rise, as with any roof. See step flashing and the lapping rule. At the ridge, alternate the laps of cedar ridge pieces, and face nail with two stainless or galvanized nails on each piece, with heads sealed. Ridge and hip pieces are laid starting at the end away from the prevailing wind, or as the instructions direct.

Keeping Cedar Healthy in the Fraser Valley

Cedar lasts when it dries. Moss, needles and overhanging branches keep shakes wet, which leads to rot and curling. Remove debris each year, see how to clean debris off a roof, and trim branches back for sun and air. Avoid pressure washing, which erodes the wood surface and opens it to water. Zinc strips can slow moss growth on cedar, but follow the product instructions, see how to install zinc strips.

Spaced Versus Solid Sheathing

Spaced sheathing gives the best drying, which suits wet climates, but it leaves no deck below for a secondary barrier and needs sturdy rafters. Solid sheathing is often used for a tighter roof, with a vented air space or a batten layer so the shakes can still dry. Which one is right depends on the design and the code. A roofer experienced with wood roofing can advise.

Common Mistakes

  • Keyways that line up. They let water run straight through to the felt and deck. Offset them by at least 1-1/2 inches.
  • Skipping the interlay felt, or using it under shingles. Shakes need the felt. Shingles without an air gap should not have it.
  • Too much exposure. It reduces overlap and lets wind-driven rain in. Stay at or under the maximum for the length and slope.
  • Ordinary steel nails. They rust and stain the wood and fail in a few years. Use hot-dip galvanized or stainless.
  • Overdriving nails. It splits the wood and leaves the shake loose and cupped.
  • Ignoring fire rules. Untreated wood roofing is restricted in many areas. Check before you buy.

When to Call a Professional

Wood shake roofing is demanding and is best left to a roofer who has done it. Call one if the roof is steep, if you do not have full fall protection, if the roof has valleys, chimneys or skylights that need flashing, or if your municipality has rules about wood roofs.

Also get a roofer's opinion before deciding between repair, recovering and replacement. Many older cedar roofs are more economical to replace than to keep patching.

Fraser Roofing does free roof inspections across the Fraser Valley, from Hope to Abbotsford. See our Roof Repair service or the towns we cover.

How to Install Cedar Shakes: Questions

What exposure should cedar shakes have?

Common figures from the Cedar Shake and Shingle Bureau for roofs of 4/12 pitch or steeper are a maximum of 7-1/2 inches for 18 inch shakes and 10 inches for 24 inch shakes. Lower slopes need less exposure. Always confirm against the manufacturer's instructions and local requirements for your product.

Do cedar shakes need felt underlayment?

Shakes are laid with 18 inch wide strips of 30 pound felt interlaid between courses, with the bottom edge of the felt above the butt by twice the exposure. The felt stops wind-driven rain. It is not interlaid between cedar shingles, which the Cedar Shake and Shingle Bureau says never to do.

How much space should be between cedar shakes?

The Cedar Shake and Shingle Bureau calls for 3/8 to 5/8 inch between shakes, and the BC Building Code calls for 6 to 9 mm (about 1/4 to 3/8 inch), so about 3/8 inch meets both and leaves room for the wood to swell when wet. Joints in one course should be offset at least 1-1/2 inches from joints in the course below so water cannot run straight through. Follow the product's installation instructions as well.

What kind of nails are used for cedar shakes?

Hot-dip galvanized or stainless steel nails, two per shake, about 3/4 inch from each edge and placed so the next course covers the heads. Stainless steel is preferred in very wet or coastal settings. Ordinary steel nails rust quickly in cedar and stain the wood. Do not overdrive them, because that splits the shake.

How long does a cedar shake roof last?

A well-installed and well-maintained cedar roof can last several decades, depending on the grade, the climate and the care it gets. In the wet Fraser Valley, moss, shade and trapped debris shorten that life, so keeping the roof clear and dry is the main factor. Pressure washing and untreated moss growth are the common killers.

Related Guides

How to Replace a Cedar ShakeTo replace a cedar shake, split the damaged shake into pieces with a chisel and remove them, cut the hidden nails with a shake ripper (slate ripper), trim a new shake about 3/4 inch narrower than the opening so it leaves a keyway of about 3/8 inch on each side, slide it up to the correct exposure, and fasten it with two galvanized or stainless nails driven where the course above covers them, or sealed if exposed. Only work dry, with fall protection.How to Clean Debris Off a Roof and Out of ValleysTo clean debris off a roof, work on a dry day, sweep or blow leaves and needles downslope with a leaf blower or a soft brush on a pole, clear valleys and the uphill side of chimneys and skylights, and finish by clearing the gutters. Never pressure wash, which strips shingle granules. Stay off the roof if it is steep, wet or mossy, and clean from a ladder or the ground with a long-handled tool.How to Install Zinc Strips to Prevent MossZinc strips are narrow metal strips installed under the ridge cap or a shingle course near the top of a roof slope. Rain washes trace zinc ions down the roof, which slows moss and algae growth on the shingles below. They do not remove existing moss, so clean the roof first. Expect protection for only a limited distance below each strip, and confirm the spacing with the manufacturer.How to Install Drip EdgeInstall drip edge by fastening it directly to the bare deck at the eaves, then laying ice and water shield and underlayment over its top flange. At the rakes, put the underlayment down first and fasten the drip edge over it. Lap joints about 2 inches, nail along the top flange about every 12 inches, and cut mitres at corners so water is directed into the gutter and away from the fascia.How to Install Step FlashingStep flashing is a row of small L-shaped metal pieces, one per shingle course, woven into the shingles where a sloped roof runs along a wall. Each piece sits on top of a shingle, gets one nail in its upper roof corner, and is covered by the next course. The wall leg runs up behind the siding or wall paper. Every piece laps the one below it by at least 3 inches (75 mm), the minimum head lap in the BC Building Code.The Lapping Rule: How Every Roof Layer Sheds WaterThe lapping rule says every layer on a roof must lie over the layer below it, like fish scales, so water running downhill always passes over the top of each joint and never behind it. Install roofing from the bottom up, and flashing from the bottom up, so each upper piece laps over the lower. A reverse lap, even a small one, is a leak path that sealant only hides temporarily.How to Install Ice and Water ShieldInstall ice and water shield on a clean, dry deck, peeling the release film in sections and pressing the membrane flat without wrinkles, starting at the eave over the drip edge. Where the BC Building Code requires eave protection on a shingle roof, it runs at least 900 mm (about 3 feet) up the slope and to a line at least 300 mm (about 12 inches) inside the inner face of the exterior wall. Common laps are 3 inches at the sides and 6 inches at the ends.

All Specialty Roofing guides|The full How-To Library

This guide is general education. Always follow the product manufacturer's installation instructions, the BC Building Code and WorkSafeBC requirements, which take priority over anything written here.

Want someone to look at your roof?

Kory & Johnny have roofed homes across the Fraser Valley since 2016. Free inspections, honest estimates, no pressure.

604-728-0146Text UsEmail

Serving Hope, Agassiz, Chilliwack, Rosedale, Abbotsford & the entire Fraser Valley

$1,000 off applies to full roof replacements of 3,000 sq ft or more. Cannot be combined with other offers or previously placed orders. Not valid on partial jobs, repairs, or insurance claims.

We use cookies and the Meta Pixel. Meta receives information about your visit and uses it to measure our ads and show you ads. Decline turns it off. Privacy policy