How to Flash Pipes and Penetrations on a Torch-On Roof

Every pipe, stack and curb is a hole in the membrane and a path for flame. Sleeves, wraps, pitch pockets and a strict fire plan.

  • Professional
  • 30 minutes to 2 hours per penetration
  • Updated

The short answer

To flash a pipe on a torch-on roof, set a pre-formed sleeve or a flashing boot over the pipe on the base ply, wrap it with a membrane strip or collar that extends at least 4 inches onto the field, lap the cap ply over it, and seal the top with a clamp or sealant. Never aim the torch at combustible pipe, vent or wall material. Use self-adhered membrane or mastic there.

Pipes, vents, stacks, conduit, supports and curbs all interrupt the membrane, and every one of them moves slightly differently from the roof. The pipe expands with hot water, the roof shrinks and swells with the seasons, and the flashing between them has to tolerate both. That is why penetrations are a leading cause of flat roof leaks, and the reason many specifications say to keep them few and to group them.

The fix is to make each penetration a separate, simple detail: a base sleeve or boot, a membrane wrap that laps onto the field, a cap ply lapped over that, and a sealed top edge. On torch-on roofs, the detail is also a fire plan. Pipes pass through the deck into the building, and the gap around them is a chimney for flame and heat.

For shingle roofs, pipe flashings are different; see how to install a plumbing vent pipe boot. For metal flues, see how to flash a B-vent. For curbs, see how to flash a curb on a flat roof. For the main membrane see how to torch a cap sheet.

Tools

  • Propane torch with hose and regulator
  • Noncombustible torch shield
  • Round-tip trowel
  • Hook blade utility knife
  • Caulking gun
  • Hose clamp driver
  • Fire extinguishers

Materials

  • Pre-formed pipe sleeve or flashing boot sized to the pipe
  • Base flashing membrane and cap flashing membrane
  • Self-adhered membrane for collars
  • Asphalt mastic
  • Pitch pocket or pipe clamp and sealant
  • Stainless hose clamps
  • Flashing metal for curbs and stacks

Safety first

  • Penetrations are the highest fire risk on a torch-on roof because flame and heat run down pipes and through the gap around them into wall and ceiling cavities. Plastic, insulation and framing are all close.
  • Do not aim a torch at a plastic vent, a combustible pipe wrap, a B-vent or a gap around any pipe. Use mastic, self-adhered membrane and a noncombustible shield.
  • Check the clearances of hot penetrations, such as metal flues, with the vent manufacturer and the building code before flashing.
  • Keep an extinguisher at each penetration while it is being worked, and continue the fire watch after work ends. Penetrations can smoulder out of sight.

Step by Step

  1. Step 1: Locate, group and support the penetrations

    A pipe that moves or is loose will tear any flashing. Fasten it, brace it if needed, and confirm that it is in the right place before anything is lapped around it. Many specifications call for at least 12 inches of clearance between a penetration and a wall, curb or other penetration so there is room to lap the membrane.

    Where several small pipes sit close together, consider a single pitch pocket or a platform instead of individual flashings.

  2. Step 2: Protect combustibles and plan the fire safety

    Look at what each penetration is made of and what is around it. Plastic vent pipe, insulated ducts, B-vents with clearance requirements, and wood blocking are all fire hazards under a torch. Close gaps around pipes with a noncombustible material or backing before any heat is used nearby.

    The detail is built so the flame is on the membrane on the roof surface, never at the pipe. Shields between the torch and the pipe are standard, and in many cases self-adhered collars replace the torch entirely.

    Watch out: Never torch around a plastic pipe or into the gap around any pipe. Heat and flame follow the pipe into the building.

  3. Step 3: Install the base sleeve or boot

    Pre-formed flashings are sized to the pipe diameter and come in rubber, lead, metal or modified bitumen. The flange sits on the base ply, bedded in mastic, and is fastened or adhered per the manufacturer. The sleeve should fit snugly, with no more than a small gap to the pipe.

    Where no pre-formed piece fits, a field-fabricated collar is cut from membrane and wrapped around the pipe. Keep laps facing downslope and keep seams away from the upslope side.

  4. Step 4: Wrap with membrane and lap onto the field

    A collar of base or cap flashing membrane is cut as a square with a hole, slit to the pipe, wrapped and lapped onto the field so it extends at least 4 inches from the sleeve in every direction. It is adhered with mastic or self-adhesive at the pipe and heat only on the field side, with a shield.

    Overlap the slit by at least 3 inches and face it away from the prevailing slope. Hold the shield between the flame and the pipe at every pass.

  5. Step 5: Lap the cap ply and seal the collar

    The cap ply is cut around the sleeve and lapped over the flange so the upstream side covers the joint. Keep the lap and bleed-out consistent, and trowel the edge. A joint that shows a gap at the flange is opened and reheated.

    Keep the cap ply seams away from the penetration by at least 12 inches where possible.

  6. Step 6: Seal the top of the sleeve

    The top of the flashing is where water runs down the pipe and into the gap. A stainless hose clamp, a storm collar or a compatible sealant bead closes it. Sealant is maintenance, not flashing: check it each year and renew it when it cracks.

    For hot penetrations, such as metal flues, use a high temperature product and the manufacturer's clearance.

  7. Step 7: Use a pitch pocket only when nothing else fits

    A pitch pocket, also called a pitch pan, is a flanged collar set over the penetration and filled with a pourable sealer. It works for irregular supports, cable groups and bundled pipes. The flange is flashed into the roof with membrane like any other flashing, and the pocket is filled with the sealer specified, leaving a slope at the top so water sheds.

    Pitch pockets shrink and crack with age and need checks every year. Many roofers prefer pre-formed flashings or clamps wherever they can be used.

  8. Step 8: Probe, test and keep the fire watch

    Check each lap with a trowel and probe after it cools. Run water around the penetration and look for drips inside if the space is accessible. Refit a loose clamp or rework an open lap.

    The fire watch at penetrations should include the room or space below. Look for a hot pipe, smoke odour or a warm ceiling.

Curbs and Larger Penetrations

Curbs, such as skylight curbs, mechanical curbs and roof hatches, are flashed like a small parapet: a cant, a two-ply upstand, a termination and a counter flashing. See how to flash parapets and upstands. Keep at least 12 inches between curbs and walls so the membrane can lap and water can flow around.

Fraser Valley Notes

Exhaust fan caps, plumbing vents and bathroom ducts on flat roofs are where moss and needle debris collect. Keep the area around a penetration clear, because debris holds water against the lap and leaves the first seam to fail.

Common Mistakes

  • Flame around plastic or combustible pipe. It melts the pipe and can ignite framing or insulation inside the gap.
  • Collars that are too small. Less than 4 inches onto the field leaves no lap margin.
  • Penetrations too close together. Less than about 12 inches makes flashing impossible to lap cleanly.
  • Relying on sealant alone. It cracks in a few seasons and leaves no lap to back it up.
  • Loose pipes. Movement tears the collar, and the leak is at the same spot every time.
  • Forgetting the top clamp. Water runs down the outside of the pipe and behind the sleeve.

When to Call a Professional

Penetrations combine waterproofing, plumbing and fire safety. Any flue, exhaust stack, gas vent or electrical service needs a roofer who knows the clearances and, where regulated, a licensed trade. Do not use an open flame near a gas vent or fuel line.

If a leak appears around a pipe on a torch-on roof, start by checking the top clamp and the collar laps. See how to repair a torch-on roof.

Fraser Roofing does free roof inspections across the Fraser Valley, from Hope to Abbotsford. See our Flat Roofing and Torch On service or the towns we cover.

How to Flash Pipes and Penetrations on Torch-On: Questions

How do you flash a vent pipe on a flat torch-on roof?

Set a pre-formed sleeve or boot over the pipe with its flange bedded in mastic on the base ply, wrap it with a membrane collar that extends at least 4 inches onto the field, lap the cap sheet over the collar, and seal the top with a stainless clamp or sealant. Keep the torch off the pipe and use mastic or self-adhered membrane there.

What is a pitch pocket on a flat roof?

A pitch pocket, or pitch pan, is a flanged metal or formed collar set over an odd-shaped penetration and filled with a pourable sealer. It is flashed into the membrane like any other flange. It is used for irregular supports and bundled cables, but the sealer shrinks and cracks, so it needs an annual check and top-up.

Why are roof penetrations a fire risk when torching?

Heat and flame can follow a pipe or the gap around it down into the wall, ceiling or insulation, and smoulder unseen for hours. Plastic pipe and insulation also melt or burn. Roofers shield the pipe, use mastic or self-adhered membrane close to it, close the gap, and keep a fire watch that includes the space below.

How far apart should roof penetrations be?

Many specifications call for about 12 inches between penetrations, and between a penetration and a wall or curb, so the membrane can lap and water can flow around each one. Closer spacing makes clean flashing difficult. Where pipes are close together, a single pitch pocket or a platform is often better than several small flashings.

Related Guides

How to Flash Parapets and Upstands With Torch-OnA torch-on parapet or upstand flashing is built in two plies over a cant strip. The base flashing ply runs up the wall, commonly at least 8 inches above the finished roof, the cap flashing ply laps over the field, and the top is terminated with a bar, counter flashing or coping. Keep flame off wood, cavities and combustible sheathing, and use self-adhered sheet where needed.How to Flash Roof Drains and Scuppers With Torch-OnTo flash a torch-on roof drain, set the drain bowl in a sump slightly below the roof surface, install the base ply and lap it under the clamping ring, torch a target sheet over the bowl, then lap the cap ply over it and clamp. Scuppers are lined with a formed box or membrane that runs through the wall and laps onto the roof. Keep flame off the pipe and wall.How to Torch a Cap SheetTo torch a cap sheet, unroll it dry over the base, align it, reroll both ends to the middle, then heat the base and the underside of the roll together until the asphalt turns glossy and forms a small rolling bead, and press the roll into it. A bleed-out bead of roughly 1/4 inch shows at the edges. Laps are about 3 inches and 6 inches. A fire watch follows.How to Repair a Torch-On RoofTo repair a torch-on roof, find the leak source first, usually a lap, flashing, split or puncture. Clean and dry the area, cut out blisters or splits, and cover the repair with a patch of cap sheet that extends at least 4 to 6 inches past the damage, bedded in mastic or fused with heat. Flame repairs carry a fire risk and should be done by trained roofers.How to Install a Plumbing Vent Pipe BootA plumbing vent pipe boot is a flange with a rubber collar that seals around a vent pipe where it passes through a shingle roof. Match the boot to the pipe diameter (commonly 2, 3 or 4 inches), slide the upper half of the flange under the shingles above, leave the lower half over the shingles below, and nail only the upper corners. Cracked collars are the usual failure, and sealant is not a repair.How to Flash a B-Vent or Metal Chimney PipeA B-vent or factory-built metal chimney passes through the roof inside a clearance-rated flashing made for that pipe. Use the flashing supplied or listed by the vent manufacturer, shingle the base over the shingles below and under the ones above, nail only the upper flange, then fit a storm collar over the pipe and seal it with high-temperature sealant. Never alter the vent or its clearance to combustibles.How to Flash a Curb on a Flat RoofFlash a flat roof curb by building it at least 8 inches above the finished roof surface, adding a cricket behind any curb wider than about 30 inches, running membrane up all four sides as an upstand, forming each corner with a molded or welded corner piece, terminating the top edge under counter flashing or a cap, and leaving room around the curb to work and probe.

All Torch-On Roofing guides|The full How-To Library

This guide is general education. Always follow the product manufacturer's installation instructions, the BC Building Code and WorkSafeBC requirements, which take priority over anything written here.

Want someone to look at your roof?

Kory & Johnny have roofed homes across the Fraser Valley since 2016. Free inspections, honest estimates, no pressure.

604-728-0146Text UsEmail

Serving Hope, Agassiz, Chilliwack, Rosedale, Abbotsford & the entire Fraser Valley

$1,000 off applies to full roof replacements of 3,000 sq ft or more. Cannot be combined with other offers or previously placed orders. Not valid on partial jobs, repairs, or insurance claims.

We use cookies and the Meta Pixel. Meta receives information about your visit and uses it to measure our ads and show you ads. Decline turns it off. Privacy policy