Tapered insulation builds slope into a flat roof. The drawing tells you which board goes where, and every joint and fastener has a job.

  • Advanced
  • 1 to 3 days for a small commercial roof
  • Updated

The short answer

Tapered insulation adds slope to a flat roof so water reaches the drains. Read the taper plan, lay a flat base layer, then place numbered tapered boards in sequence from each drain outward, typically at 1/8 or 1/4 inch per foot, with crickets at 1/2 inch per foot. Stagger joints by at least 6 inches between layers, keep boards tight, and fasten or adhere to the deck per the wind design.

Many flat roofs are built almost level and, because decks deflect and settle, end up with low spots. Tapered insulation is the standard way to fix that. Instead of flat boards of uniform thickness, the insulation is supplied as wedges that slope in one direction, cut and numbered to a plan, so the insulation itself becomes the slope that carries water to the drains.

Installing it is not like laying ordinary boards. A tapered system comes with a drawing showing each board by number or letter, each drain, each cricket and the thickness at every point. Put a board in the wrong place and the slope goes the wrong way. Done right, water runs to the drains on every part of the roof and ponding ends.

This guide covers reading the plan and laying the insulation. The reason for the slope is in how to plan flat roof drainage, and the drain itself is in how to install a flat roof drain.

Tools

  • Chalk line and tape measure
  • Utility knife with a long blade or insulation saw
  • Screw gun with depth-setting nosepiece
  • Hot-mop or adhesive applicator as required by the system
  • Straightedge and level
  • Pencil or marker
  • Copy of the taper plan

Materials

  • Tapered polyisocyanurate boards in the plan's numbered profiles
  • Flat base layer insulation
  • Cricket boards, typically at 1/2 inch per foot
  • Cover board compatible with the membrane
  • Insulation fasteners and plates, or approved adhesive
  • Foam-compatible tape and sealant at penetrations

Safety first

  • Insulation boards are large, light and catch the wind. A 4 by 8 foot sheet acts as a sail on the roof, so stack and weigh it down, carry it low and keep it away from edges.
  • Stacks of boards are heavy on a roof that may already be carrying load. Spread them out over supporting framing and do not pile them on one area of the deck.
  • Work tied off, and mark or cover open drain holes so nobody steps into one.

Step by Step

  1. Step 1: Prepare the deck and read the taper plan

    The deck must be sound, dry, clean and flat enough to receive boards. Fix loose fasteners, sag and damaged areas. Install the vapour control or air barrier layer if the design calls for one, and check the plan against the actual roof, since existing drains, curbs and walls sometimes sit in different places than the drawings show.

    A taper plan usually shows the roof divided into bays around each drain, with a numbered or lettered board for every area. Thicknesses at the high and low ends are noted, and the slope in inches per foot is given. Common slopes are 1/8 inch per foot and 1/4 inch per foot for the main taper, and steeper for crickets. Study the layout and find the thinnest point, which is at the drain, and the thickest, which is at the high points and ridges.

    Tip: Lay out the boards dry in one bay first. If the numbers do not meet up as the plan says, find the problem before the whole roof is committed.

  2. Step 2: Install the flat base layer

    Most systems use one or two flat layers under the tapered layer. Place boards with the long edge across the deck flutes on a steel deck, and stagger the joints so end joints in one course do not line up with the next. Butt the boards tight, without forcing them. Gaps leave thermal bridges and a soft spot under the membrane.

    Fasten to the structural deck with the approved fasteners and plates, at the spacing the wind design gives. Fastener pattern is engineered for wind uplift, so do not guess. On a wood or concrete deck, the design may call for adhesive instead.

  3. Step 3: Start the tapered layer at each drain

    The drain is the lowest point on the roof, so the layout starts there. The boards around the drain are usually the thinnest, and they slope down toward the drain body. Place the first board and check its orientation against the plan before fastening. A board turned 180 degrees slopes away from the drain.

    Work outward, matching each board number to the plan. Keep all the joints tight and check that boards meet correctly at the corners. At the drain, the insulation must be cut back to allow for the drain sump and clamping ring. See how to install a flat roof drain.

  4. Step 4: Stagger the joints between layers

    Insulation boards shrink slightly and move. A joint that runs straight through two layers becomes a thermal channel and a place where the membrane can crack. Stagger both long and end joints between layers, offsetting them by at least 6 inches. Where the taper plan does not allow this, use the closest arrangement that does.

    Fill any gaps wider than about 1/4 inch with compatible foam or cut pieces of insulation. Do not leave voids under the membrane, and do not use a soft filler that compresses.

  5. Step 5: Build the crickets

    A cricket is a pair of sloped planes meeting in a ridge that divides water. It is placed on the upslope side of a curb, at wall corners and between drains. Cricket boards are cut from tapered stock in the pattern shown on the plan, and are installed on top of the base and main taper layers.

    Crickets slope more steeply than the roof, commonly about 1/2 inch per foot, so that water always has a path around an obstruction. Check that the cricket edges meet the main taper surface cleanly, without ridges, and that the cricket ends at the drain side lead water toward the drain. See also how to flash a curb on a flat roof.

  6. Step 6: Fasten or adhere the boards

    Fasteners must reach the structural deck at the required depth. With tapered boards, thickness varies, so fastener length changes across the roof. Check the plan for which length goes where, and use a depth-setting driver so plates sit flush without crushing the board.

    Perimeter and corner zones get more fasteners than the field, like the membrane above. See how to install mechanically fastened TPO for how those zones are defined. If the insulation is adhered, follow the adhesive manufacturer's ribbon or spray pattern and keep the boards in the open time.

  7. Step 7: Add the cover board and check the slope

    Most membrane systems need a cover board over polyiso for puncture resistance, fire performance and a compatible surface. Stagger its joints away from the insulation joints, and fasten as specified.

    Check the finished slope with a long straightedge and a level, and check that no high spots lie between the drains and the water. If the roof can be wetted before the membrane goes on, a hose test will show where water runs. Correct any flat spots now.

Taper Rates and Minimum Thickness

  • 1/8 inch per foot: the lightest common taper, used when the structure already has some slope. It is below the usual manufacturer minimum on its own and is often added to existing slope.
  • 1/4 inch per foot: the standard main taper on most low-slope reroofs.
  • 1/2 inch per foot: typical for crickets and steeper transitions.
  • Minimum thickness: the thinnest point, usually at the drain, is set by the plan to keep the required R-value, and the code sets the total insulation requirement.

Insulation Compatibility

Polyisocyanurate is the most common tapered insulation for membrane roofs, and it has facers that must match the adhesive or cover board. Expanded polystyrene is also used for tapered systems and is sensitive to solvent adhesives and to contact with PVC. Always confirm the insulation, the cover board and the membrane are approved together by the manufacturer.

Wet insulation must never be covered. If an old roof is being replaced, test the insulation for moisture, and remove any that is wet, which is also the point where a sagging deck is found.

Common Mistakes

  • Boards in the wrong position. A rotated or swapped tapered board slopes water away from the drain. Match every number to the plan.
  • Joints that line up between layers. Through-joints open up, and the membrane above cracks at them.
  • Gaps left open. Voids under the membrane create soft spots and allow wind to work into the assembly.
  • Fasteners that are too short or too long. Short ones do not reach the deck, and long ones can break through the ceiling below.
  • Crickets forgotten. Water backs up behind curbs and between drains.
  • Covering wet insulation. Trapped moisture ruins the new roof from the inside.

When to Call a Professional

A tapered system is engineered: the plan, wind uplift design, insulation value and drainage all depend on boards being in the right place. It is a job for a roofer who has worked from taper plans before, particularly on roofs with several drains.

Call a roofer if a flat roof ponds, if you are not sure whether the existing insulation is wet, or if a roof has no plan for its slope. The plan usually comes from the insulation supplier after measuring the roof, which is where any project should start.

Fraser Roofing does free roof inspections across the Fraser Valley, from Hope to Abbotsford. See our Flat Roofing and Torch On service or the towns we cover.

How to Install Tapered Insulation and Crickets: Questions

What is tapered insulation on a flat roof?

Tapered insulation is roof insulation made in wedge-shaped boards that slope in one direction, installed to a numbered plan so the insulation itself creates slope toward the drains. It is used on flat roofs with too little slope, and it usually has a flat base layer below and a cover board above.

How much slope does tapered insulation add?

Common taper rates are 1/8 inch per foot and 1/4 inch per foot for the main roof, and about 1/2 inch per foot for crickets. Many membranes require at least 1/4 inch per foot overall, so a 1/8 inch taper is often combined with existing slope or a second taper layer to reach it.

What is a cricket on a flat roof?

A cricket is a small, sloped ridge that divides water around an obstruction, such as a curb or wall, or carries it from the middle of the roof toward a drain. On flat roofs it is built from tapered insulation, usually at about 1/2 inch per foot, and it stops water from stopping on the upslope side of an obstacle.

Should insulation joints be staggered?

Yes. Joints between layers should be offset by at least 6 inches so no seam runs through the full thickness. Through-joints act as thermal bridges and can open as boards move, cracking the membrane above. Stagger both long and end joints, and keep boards butted tight with gaps filled.

Related Guides

How to Plan Flat Roof DrainagePlan flat roof drainage by giving every part of the roof a path to a drain, scupper or gutter: a minimum slope of 1/4 inch per foot, drains at the low points, crickets to split water between drains, and a separate overflow set about 2 inches above the primary drain. Water that stays more than 48 hours after rain is ponding and should be corrected, not tolerated.How to Install a Flat Roof DrainTo install a flat roof drain, set the drain body in a recessed sump at the roof's lowest point, connect it to the storm pipe below, then run the membrane over the drain flange, weld or adhere it as the system requires, cut the opening, and fasten the clamping ring so the membrane is held and sealed. Finish with a dome strainer. The drain bowl sits slightly below the surrounding roof.How to Flash a Curb on a Flat RoofFlash a flat roof curb by building it at least 8 inches above the finished roof surface, adding a cricket behind any curb wider than about 30 inches, running membrane up all four sides as an upstand, forming each corner with a molded or welded corner piece, terminating the top edge under counter flashing or a cap, and leaving room around the curb to work and probe.How to Install Mechanically Fastened TPOA mechanically fastened TPO roof is secured with fasteners and plates driven through the sheet edge into the deck, then covered by the next sheet, which is hot-air welded over them. Sheets are commonly 10 feet wide with about a 6 inch lap. Fasteners along the seam are commonly about 12 inches on centre in the field and 6 inches or closer in the perimeter and corner zones. Fastener rows and spacing come from the wind uplift design, not from habit.How to Choose a Flat Roof MembraneChoose a flat roof membrane by matching the system to the roof: torch-on modified bitumen suits complex details and heavy use, EPDM is a simple, flexible rubber sheet for plain roofs, TPO is a reflective heat-welded sheet for larger roofs, and PVC adds chemical and grease resistance. Check slope, traffic, details, access, fire rules and who can install it.How to Prep a Deck for Torch-On RoofingPrepping a deck for torch-on means repairing rot, confirming a slope of at least 1/4 inch per foot to drains, drying the deck, fastening a cover board or base sheet that keeps flame off wood, priming concrete or metal, sealing gaps and shielding every combustible edge. Torching stops if the surface is wet, frosty or dusty. Prep takes longer than the membrane does.How to Prep a Roof Deck for EPDMTo prep a deck for EPDM, repair rot and loose sheathing, confirm the slope to drains, fasten any insulation and cover board, sweep and clean the surface, remove nails and sharp edges, and check that it is dry and within the adhesive's temperature range, commonly about 5 degrees Celsius or higher. Unroll the membrane and let it relax for at least 30 minutes before gluing.

All Flat Roof Details guides|The full How-To Library

This guide is general education. Always follow the product manufacturer's installation instructions, the BC Building Code and WorkSafeBC requirements, which take priority over anything written here.

Want someone to look at your roof?

Kory & Johnny have roofed homes across the Fraser Valley since 2016. Free inspections, honest estimates, no pressure.

604-728-0146Text UsEmail

Serving Hope, Agassiz, Chilliwack, Rosedale, Abbotsford & the entire Fraser Valley

$1,000 off applies to full roof replacements of 3,000 sq ft or more. Cannot be combined with other offers or previously placed orders. Not valid on partial jobs, repairs, or insurance claims.

We use cookies and the Meta Pixel. Meta receives information about your visit and uses it to measure our ads and show you ads. Decline turns it off. Privacy policy